an All-Weather Horse Race Track integrated around the existing turf track to include: new 2.2km long sand based track ranging in width from 14-18m including 3 furlong sprint chute extension, 3.2m wide Gallop inc. all assoc. site infrastructure such as railings, start locations and other ancillary infrastructure, new Underpass to All Weather and Turf Track, surface water drainage system to new track inc. storm water attenuation pond and storm water retention pond located inside the existing turf track, attenuation pond to the NW of the new all-weather track, modifications to existing turf track to facilitate new track, dedicated 3.0 to 3.5m wide circulation track to perimeter of new track for movement of emergency and service vehicles, new underpass for movement of vehicles from outer to inner track areas, treatment and upgrade to existing site boundaries, demolition of existing stable block (60 stables) and erection of new stable blocks comprising of 82 stables and assoc. works, demolition of Ancillary Building of 18m2, removal of existing parade ring (1,265m2) and construction of new parade ring (1,565m2) and assoc. works, demolition of maintenance shed of 180m2 and construction of new maintenance shed of 360m2, provision ...
Signup to read full development description