Summary

178applications
54granted
17refused
107pending or other

Most recent applications

Exact addresses and full descriptions are included with business accounts.

Get wind farm alerts
Most recent wind farm planning applications
ReceivedLocationDevelopmentStatus
15/10/2026 Leinster The development comprises amendments to the permitted Energy Centre under WCC Reg. Ref.: 21/1080, as amended by WCC Reg. Ref.: 23/843, which arose during detailed design stage… New
14/10/2026 Munster We, Gortloughra Wind Farm Limited, intend to apply for planning permission for development at this site within the townlands of Inchiroe, Cloghboola, Cornery, Tooreenalour… New
13/10/2026 Leinster Permission for the following: The provision of 3 No. Open Cycle Gas Turbines (OCGT) Generators each consisting of an Air Intake Filter System, Exhaust Stack (23m high), Fin Fan… New
05/10/2026 Leinster RED III Level 1- extension of the operational life of the existing Cronelea wind farm and associated infrastructure (as permitted pursuant to Wicklow County Council Planning… New
29/09/2026 Leinster RED III Level 1- extension of the operational life of the existing Cronelea Wind Farm and associated infrastructure (as permitted pursuant to Wicklow County Council Planning… New
24/09/2026 Connacht To extend wind turbine test site to rear of factory premises to include; 1) 11 No 20-30Kw wind turbines 31m height to tip of propeller. 2)… New
24/09/2026 Munster The development will consist of: · Works at 20 No. locations along the Turbine Delivery Route (TDR) to facilitate abnormal loads for the delivery of turbine components to the… New
18/09/2026 Connacht For; (1) Amendments to the permitted Ardderroo Synchronous Condenser (Galway County Council Reference No. 23/60641, 24/61485, 25/60575 and 25/61825) comprising repositioning of… New
11/09/2026 Munster We, Inchamore Wind Designated Activity Company, intend to apply for permission for development of this site at the townlands of Inchamore (na hInse Móire), Milleeny (na Millíní)… New
08/09/2026 Ulster VARIATION OF CONDITION NO. 4 OF PERMISSION GRANTED FOR CRILLY WIND FARM (PLANNING REF. NO. 13/51404 AND AN COIMISIÚN PLEANÁLA REF. ABP PL 05E.245588 REFERS) WHICH RELATES TO THE… Decision
01/09/2026 Munster For the extension of the operational duration of the existing Kilgarvan Phase II Wind Farm and associated infrastructure (as permitted in Kerry County Council Planning Refs… New
28/08/2026 Munster RED III: The erection of 4 no Vestas V47 wind turbines (45.00m tower height, 69.85m tip height), the construction of 4 no 23.00 sq m electrical sub-stations / control buildings… New
25/08/2026 Leinster RED III application Level 1 - consist of a ten year planning permission to develop an electricity service, entailing the laying of approximately 23.9 kilometers of 38kV cable from… New
17/08/2026 Leinster The proposed development will comprise the following: Construction/ installation of an Open Cycle… Decision
27/07/2026 Connacht The proposed development will be located in the townland of Dooleeg More, Co. Mayo. The development will be a “community led project” and will comprise a single electricity… FI requested
17/07/2026 Connacht The proposed development will be located in the townland of Dooleeg More, Co. Mayo. The development will be a “community led project” and will comprise a single electricity… New
08/07/2026 Ulster A PERIOD OF 10 YEARS FOR PROPOSED WORKS TO FACILITATE THE DELIVERY OF TURBINE COMPONENTS TO THE PERMITTED OWENINNY WIND FARM PHASE 3 (REF. NO. PA16.316178). THE TURBINE DELIVERY… FI requested
30/06/2026 Connacht Bord na Móna Powergen Ltd., intend to apply for permission for proposed minor temporary and permanent works to facilitate the delivery of turbine components to the permitted… New
30/06/2026 Ulster PROPOSED WORKS TO FACILITATE THE DELIVERY OF TURBINE COMPONENTS TO THE PERMITTED OWENINNY WIND FARM PHASE 3 (REF. NO. PA16.316178). THE TURBINE DELIVERY ROUTE (TDR) WILL ORIGINATE… New
30/06/2026 Connacht Bord na Móna Powergen Ltd., intend to apply for permission for proposed minor temporary and permanent works to facilitate the delivery of turbine components to the permitted… FI requested
26/06/2026 Leinster REDIII - the development consists of the following elements: 1. Replacement of an existing small wind turbine (planning approval 91/001334) with a new small wind turbine. The… FI requested
24/06/2026 Munster A) New Single Storey Dwelling, Detached Garage and Sewage Treatement System b)… Decision
16/06/2026 Leinster Sonairte the National Ecology Centre CLG intend to apply for permission for development at Ninch, Laytown, Co. Meath, A92 D9XH. The development consists of the following elements… New
12/06/2026 Munster The erection of 2 no. Vestas V52 850Kw Wind Turbines (49.00m tower hub height and 75.00M blade tip height). The construction of 1 no. 23.00… New
08/06/2026 Munster Permission for:- 1) The demolition of an existing ruined 2-storey detached dwelling and associated outbuildings and structures, 2) The construction of a replacement dwelling, 3)… Decision
05/06/2026 Leinster RED III Category 1 - extension of the operational life of the Ballycumber wind farm located in the townlands of Ballycumber North and Ballycumber South, County Wicklow. the… Decision
29/05/2026 Munster RED III Development which will consist of the construction and operation of a renewable energy development comprising the following; - 4 No. wind turbines with a tip height of… FI requested
26/05/2026 Leinster For a 10-Year planning permission for development at this site located in the townlands of Ballytobin & Ballyhall, County Kilkenny. The development will consist of the… New
25/05/2026 Leinster Replacement of the existing small wind turbine, which has been in place for 34 years (planning approval 91/001334) with a new small wind turbine of similar size… New
20/05/2026 Ulster (1) ERECTION OF THREE 4.5 MEGAWATTS (MW) WIND TURBINES WITH A BLADE TIP HEIGHT OF 150M CONSISTING OF A ROTOR DIAMETER OF 136M AND A HUB HEIGHT OF 82M, (2) ERECTION OF ONE 4.2… New