Skip to main content

BLACK FRIDAY 2026: Subscriber plan now 50% off for the year. See plans

Appealed Permission

A site of 1.621 Ha in Galway Port at Dock Road and Lough Atalia Road Galway City, and extending to include parts of both roads, for road infrastructure works and water services infrastructure works

Galway City Council Received 19 Sep 2025

Proposed development

Permission for development which consists of: The proposed development principally consists of: the demolition of the existing office / bus depot building (370.2 sq m) and ancillary building (26.0 sq m); the partial demolition of the existing ESB sub-station and ancillary building (67.4 sq m); the demolition of existing boundary walls at the south-west and north-west; and the construction of a mixed-use development. The proposed mixed-use development primarily comprises: 356 No. residential apartments (172 No. 1-bed, 169 No. 2-bed and 15 No. 3-bed); crèche (255.9 sq m); 2 No. café/restaurant units (totalling 428.4 sq m); and 1 No. retail unit (156.0 sq m). The development has a total floor area of 32,096.0 sq m and is primarily proposed in 4 No. blocks (identified as A–D) that generally range in height from 6 No. to 13 No. storeys: Block A ranges from 6 No. to 9 No. storeys; Block B ranges from 6 No. to 11 No. storeys; Block C is 6 No. storeys; and Block D ranges from 6 No. to 13 No. storeys. The proposed development also…

You’re reading part of this description. Subscribers see the full text of every application.

Timeline

  1. Application received
  2. Further info requested
  3. Further info received
  4. Decision
  5. Appeal lodged

Application details

Application type
Permission
Council status
Appealed
Decision
Refused
File number
Register updated
27 Oct 2026

Appeal to An Coimisiún Pleanála

Case number
324442
Lodged
17 Jul 2026
Status
Case is due to be decided by 03/11/2026

Site and nearby applications

500 m

Guests see 500 m.

  • This site
  • New
  • Decision
  • Further info
  • Other

26 applications within 500 m