Mell, Drogheda, Co. Louth
Proposed development
Hibernia Steel (Manufacturing) Limited are preparing a planning application to construct and operate a hot-dip galvanising facility. It is planned to process up to 36,000TPA of steel at the facility. In summary the proposal includes: • Construction of a main building with an approximate gross floor area of 5719m2. The building is divided into three main sections In-take/out-take section at the southern end of the building. This is single storey and has a maximum height above finished ground floor level of 14.55m. • Processing & services area at the northern end of the building. This is also single storey with maximum height above finished ground levels of 17.30m. The processing area is the area where the steel is pre-treated and galvanised. • Construction of 4 No. stacks on roof of building. These will be located on the roof at a height of 20 m above finished floor level (or 63 m aOD). • Construction of ESB sub-station within the main building. • Installation of 2 no…
You’re reading part of this description. Subscribers see the full text of every application.
Timeline
- Application received
Application details
- Application type
- Permission
- Council status
- Incompleted Application
- File number
- Register updated
- 11 Nov 2026
Site and nearby applications
Guests see 500 m.
- This site
- New
- Decision
- Further info
- Other
5 applications within 500 m
- Appeal result Mell, Drogheda, Co. Louth Permission · Feb 16 10 m
- New Mell, Drogheda, Co Louth Permission · Jul 15 2024 170 m
- Decision IDA Drogheda North Business Park, Mell Drogheda, Co Louth Permission · Nov 22 2024 170 m
- Appeal result IDA Drogheda North Business Park, Mell Drogheda, Co. Louth Permission · Oct 22 2025 200 m
- Decision Mell, Drogheda, Co Louth Permission · May 29 490 m