2.5km |
07/03/2024 |
N/A |
Drumcliffe South , Rathcormac , Co. Sligo |
The development will consist of the construction of a dry bedded sheep shed with an effluent storage tank along with all associated site works. There will be one buildings and one concrete effluent tank. All effluent from the dry bedded shed will be... login required. |
Details... |
1.3km |
21/12/2023 |
CONDITIONAL |
Kintogher , Co. Sligo , Ireland |
to construct a dwelling house with sewage treatment system and percolation area, access onto public roadway and all associated site works ... login required. |
Details... |
2.1km |
24/11/2023 |
CONDITIONAL |
Tully Hill , Rathcormac , Sligo |
The development will consist of
A: Constructing a single storey extension to the side and front of existing 2 storey dwelling
B: Minor alterations to all existing elevations
and all ancillary site works.... login required. |
Details... |
1.2km |
18/10/2023 |
CONDITIONAL |
St. Helen's , Cregg Rosses Point , Co. Sligo |
(a) the construction of two split level side extensions and a single storey rear extension following the demolition of the existing left hand side extension and existing extensions to the rear elevation; (b) the incorporation of a new garage area into the existing topography of the land to the fr... login required. |
Details... |
1.3km |
20/09/2023 |
CONDITIONAL |
Cregg Village , Rosses Point , Co. Sligo |
Development consisting of the Installation of 600kw (1,696m2) Of ground mounted solar PV array and associated site works and services. The ground mounted PV array will be installed over two (2) number phases. Phase 1, which will consist of 300kw of ground mounted solar PV to meet the facilities current onsite electrical requirements. Phase 2, will also consist of another 300kw Of... login required. |
Details... |
2.1km |
19/09/2023 |
CONDITIONAL |
Rahaberna , Sligo , Co. Sligo |
Permission for change of house design from that previously permitted under PL 14/36 with all associated works ... login required. |
Details... |
2.7km |
30/08/2023 |
CONDITIONAL |
SECOND SEA ROAD , SLIGO |
The development will comprise the following:
A Large-Scale Residential Development of:
A total of 127 No. residential units consisting of
a) 11 No. – Type A– 4 Bed Semi Detached Houses
4 No. – Type A1 – 5 Bed Semi Detached Houses
60 No. – Type B/B1 – 3 Bed Semi Detached/Terraced/Detached Houses
28 No. – Type C – 2 Bed Apartments
10 No. – Type D – 2 Bed Semi Detached/Terraced Dormer Houses
4 No. – Type E – 2 Bed Semi Detached Bungalow ... login required. |
Details... |
2.7km |
25/08/2023 |
CONDITIONAL |
Rahaberna , Rathcomac , Sligo |
construction of a single storey dwelling, garage, effluent treatment system, percolation area, plus ancillary site works... login required. |
Details... |
630m |
25/08/2023 |
N/A |
Hazelhatch , Ballincar , Rosses Point |
development consisting of ground floor pitched roof extension to rear and shallow flat roof extension to proposed master bedroom, closing off existing set back porch on southeast corner to in... login required. |
Details... |
1.3km |
19/08/2023 |
N/A |
Rosses Punto Limited , Cregg Village , Rosses Point |
The Owner of the facility at Cregg Village is experiencing very high electrical energy usage on site.
The facility has now become fully occupied and active in its capacity as temporary accommodation for refugees fleeing the ongoing conflict in Ukraine.
To alleviate the high energy usage, costs and associated carbon footprint, the owner of the facility is looking to obtain planning permission to supply and install a new 600kWp Ground mounted, The proposed ground mounted PV system shall be installed over two (2) number Phases. Phase 1 shall consist of 300kW of ground mounted solar PV being installed to meet the facilities current on site electrical demand. It is envisaged that Phase 2 will progress at a later date in tandem with the facilities planned electrification of their heating system over the coming Five (5) years. The 300kW installed under Phase 2 will be designed to meet the electrical input power required to satisfy the thermal loadings of future heat pump systems.
The primary purpose for both phase 1 & phase 2 PV arrays will be for on site self consumption to meet the existing on site electricity usage, in instances where there is over production in summer months, the PV array will export any excess energy to the nati... login required. |
Details... |
2.5km |
11/07/2023 |
CONDITIONAL |
Teesan Co. Sligo , |
development consisting of the construction of a new dwelling house with sewage treatment system and separate domestic garage and all associated site development works... login required. |
Details... |
2.2km |
06/06/2023 |
CONDITIONAL |
Rahaberna , Drum , Co. Sligo |
retention of a single storey sunroom extension constructed to front of dwelling house with all associated site works ... login required. |
Details... |
30m |
06/06/2023 |
CONDITIONAL |
Lands to the North of Radisson Blu Hotel & Spa Sligo , Ballincar Rosses Point , Co. Sligo |
the erection of 22 no. single story glamping pods, and 1 no. storage building, with associated landscaping, site works and services... login required. |
Details... |
2.5km |
28/04/2023 |
CONDITIONAL |
Rathcormac , Co. Sligo |
development consisting of (a) construction of a single storey house & garage, (b) installation of a new wastewater treatment system & percolation area, (c) modification of the existing vehicular access, (d) all associated site works... login required. |
Details... |
330m |
04/04/2023 |
CONDITIONAL |
Ballincar , Co. Sligo , N/A |
The development will consist of the provision of 3 no. new dwelling houses which will comprise:
- House Type A - 4-bedroom detached family home (267.4sqm) with storage shed (15.7sqm);
- House Type B - 4-bedroom detached family home (265.5sqm) with storage shed (15.7sqm); and
- House Type C - 4-bedroom detached family... login required. |
Details... |
2.1km |
02/03/2023 |
CONDITIONAL |
Tullyhill , Rathcormack , Co. Sligo |
development consisting of roof of extension to side of dwelling as built which differs from that permitted under Planning Permission Reference PL 8033/78 and all associated site works ... login required. |
Details... |
3km |
03/01/2023 |
CONDITIONAL |
Creggyconnell , Rosses Lower Rosses Point , County Sligo |
development consisting of construction of a single storey detached domestic dwelling; a waste water treatment system; and all associated site works... login required. |
Details... |
1.5km |
16/12/2022 |
CONDITIONAL |
Cregg , Rosses Point , Co. Sligo |
development consisting of (1) demolish existing dwelling house and construct new single storey dwelling house with new onsite wastewater treatment system and all associated site works (2) relocate the existing vehicular entrance and all associated site works... login required. |
Details... |
2.5km |
24/11/2022 |
N/A |
An Nead , Drumcliff South Td , Rathcormac |
development consisting of construction of domestic garage associated with existing dwelling... login required. |
Details... |