360m |
26/04/2024 |
n/a |
St. Cecilia's School, Cregg, Rosses Point, Co. Sligo F91 X283 |
A new energy centre comprising a boiler house, heat pump and gas enclosure (combined area 150m2) and ancillary site works.... login required. |
Details... |
1.7km |
24/04/2024 |
n/a |
Ballyweelin, Rossespoint, Sligo |
Extension of 24M2 to the rear and a 16M2 covered deck and 5.7M2 shed to the front side of the house, demolition of existing front porch and 1 chimney and existing rear extension and shed and enlargement of 2 windows to the front.... login required. |
Details... |
2.8km |
09/04/2024 |
n/a |
Rosses Lower, Rosses Point, County Sligo, F91 AX21 |
installation of a waste water treatment system and associated percolation area on my property and to decommission the existing septic tank and percolation... login required. |
Details... |
2.6km |
07/03/2024 |
CONDITIONAL |
Drumcliffe South , Rathcormac , Co. Sligo |
the construction of a dry bedded sheep shed with an effluent storage tank along with all associated site works ... login required. |
Details... |
2.7km |
22/12/2023 |
CONDITIONAL |
Drumcliffe , Drumcliffe , Co. Sligo |
alterations and extension to domestic dwelling house including reconstruction of existing porch, single storey extension to east with two Velux rooflights, landscaping and all associated work... login required. |
Details... |
800m |
21/12/2023 |
CONDITIONAL |
Kintogher , Co. Sligo , Ireland |
to construct a dwelling house with sewage treatment system and percolation area, access onto public roadway and all associated site works ... login required. |
Details... |
2.7km |
24/11/2023 |
CONDITIONAL |
Tully Hill , Rathcormac , Sligo |
The development will consist of
A: Constructing a single storey extension to the side and front of existing 2 storey dwelling
B: Minor alterations to all existing elevations
and all ancillary site works.... login required. |
Details... |
1.5km |
10/11/2023 |
CONDITIONAL |
Lands to the North of Radisson Blu Hotel & Spa Sligo , Ballincar Rosses Point , Co. Sligo |
development consisting of Permission for Retention of 5 X 2000L over ground gas storage tanks with associated landscaping and services... login required. |
Details... |
730m |
18/10/2023 |
CONDITIONAL |
St. Helen's , Cregg Rosses Point , Co. Sligo |
(a) the construction of two split level side extensions and a single storey rear extension following the demolition of the existing left hand side extension and existing extensions to the rear elevation; (b) the incorporation of a new garage area into the existing topography of the land to the fr... login required. |
Details... |
1.9km |
16/10/2023 |
CONDITIONAL |
Ballyweelin , Rosses Point , Co. Sligo |
Development of a two storey dwelling and attached domestic carport with roof terrace over, along with new vehicular entrance and connection to public services and all ancillary site development works
(height of proposed building 8,175mm)... login required. |
Details... |
260m |
20/09/2023 |
CONDITIONAL |
Cregg Village , Rosses Point , Co. Sligo |
Development consisting of the Installation of 600kw (1,696m2) Of ground mounted solar PV array and associated site works and services. The ground mounted PV array will be installed over two (2) number phases. Phase 1, which will consist of 300kw of ground mounted solar PV to meet the facilities current onsite electrical requirements. Phase 2, will also consist of another 300kw Of... login required. |
Details... |
260m |
19/08/2023 |
N/A |
Rosses Punto Limited , Cregg Village , Rosses Point |
The Owner of the facility at Cregg Village is experiencing very high electrical energy usage on site.
The facility has now become fully occupied and active in its capacity as temporary accommodation for refugees fleeing the ongoing conflict in Ukraine.
To alleviate the high energy usage, costs and associated carbon footprint, the owner of the facility is looking to obtain planning permission to supply and install a new 600kWp Ground mounted, The proposed ground mounted PV system shall be installed over two (2) number Phases. Phase 1 shall consist of 300kW of ground mounted solar PV being installed to meet the facilities current on site electrical demand. It is envisaged that Phase 2 will progress at a later date in tandem with the facilities planned electrification of their heating system over the coming Five (5) years. The 300kW installed under Phase 2 will be designed to meet the electrical input power required to satisfy the thermal loadings of future heat pump systems.
The primary purpose for both phase 1 & phase 2 PV arrays will be for on site self consumption to meet the existing on site electricity usage, in instances where there is over production in summer months, the PV array will export any excess energy to the nati... login required. |
Details... |
2.2km |
14/08/2023 |
Conditional |
Kintogher, Rosses Point, Co. Sligo, F91 XD34 |
development consisting of carrying out alterations to the existing dwelling, a protected structure (RPS No. 257 CDP), including new windows and doors, internal alterations and increasing the outbuilding ridge height; to demolish the rear extension, to demolish/remove 4 no. outbuildings/sheds, to decommission t... login required. |
Details... |
1.4km |
06/06/2023 |
CONDITIONAL |
Lands to the North of Radisson Blu Hotel & Spa Sligo , Ballincar Rosses Point , Co. Sligo |
the erection of 22 no. single story glamping pods, and 1 no. storage building, with associated landscaping, site works and services... login required. |
Details... |
2.5km |
02/05/2023 |
CONDITIONAL |
Drumcliffe South , Drumcliffe , Co. Sligo |
Planning permission to retain a detached domestic garage constructed to rear of dwelling house.... login required. |
Details... |
2.6km |
28/04/2023 |
CONDITIONAL |
Rathcormac , Co. Sligo |
development consisting of (a) construction of a single storey house & garage, (b) installation of a new wastewater treatment system & percolation area, (c) modification of the existing vehicular access, (d) all associated site works... login required. |
Details... |
1.6km |
04/04/2023 |
CONDITIONAL |
Ballincar , Co. Sligo , N/A |
The development will consist of the provision of 3 no. new dwelling houses which will comprise:
- House Type A - 4-bedroom detached family home (267.4sqm) with storage shed (15.7sqm);
- House Type B - 4-bedroom detached family home (265.5sqm) with storage shed (15.7sqm); and
- House Type C - 4-bedroom detached family... login required. |
Details... |
2km |
03/04/2023 |
CONDITIONAL |
Joppa Lodge , Ballyweelin , Co.Sligo |
development consisting of the demolition of an existing two storey dwelling and replacement with a new two storey dwelling... login required. |
Details... |
2.7km |
02/03/2023 |
CONDITIONAL |
Tullyhill , Rathcormack , Co. Sligo |
development consisting of roof of extension to side of dwelling as built which differs from that permitted under Planning Permission Reference PL 8033/78 and all associated site works ... login required. |
Details... |
1.5km |
03/01/2023 |
CONDITIONAL |
Creggyconnell , Rosses Lower Rosses Point , County Sligo |
development consisting of construction of a single storey detached domestic dwelling; a waste water treatment system; and all associated site works... login required. |
Details... |