11A Ballyhoy Avenue, Dublin 5
Jul 10 2025
DecisionJul 14 2025
Decision DueAug 14 2025
Granted-
Submitted: 20 / 05 / 2025
-
Application Type:
Permission -
Application Status:
Decision Notice Issued -
Council Decision:
GRANT PERMISSION (Unknown)
Useful Links:
Development Description:
Planning permission for the construction of (1) single storey extension to the front/side/rear/ of the existing dwelling, (2) removal of the existing front window in the existing dwelling at ground floor level and its replacement with 2 smaller windows to the front, (3) to revise the existing pitched roof on an existing single storey element to the rear and replace it with a flat roof, (4) a dormer window to the rear at attic level into the existing attic room, (5) to raise a section of side boundary wall along Nanikin Avenue to 2.2 meters in height, (6) provision of SUDS drainage with all associated site works.
Nearby Applications:
Appeals / Commencement
No Appeals Found
Decision Appealed:
- Appeal Submitted:
- Appeal Status:
- Appeal Decision:
- An Coimisiún Pleanála File Ref.:
- Note: If an appeal has been lodged and information isn't showing then this means An Coimisiún Pleanála hasn't published the data for reuse by PlanningAlerts.ie. You will need to follow up directly on the ACP website. Use the reference number, above, if available.
No Commencement Found
Commencement Information:
- Notice Submitted:
- Start Date:
- BCMS Notice:
- View on BCMS Website
Copyright:
Planning Data is published by Department of Housing, Planning and Local Government and is licensed under a Creative Commons Attribution-NoDerivatives 4.0 International License.