Jun 22 2025

Application Received

Aug 14 2025

Decision

Aug 15 2025

Decision Due

Sep 18 2025

Granted
  • Submitted: 22 / 06 / 2025
  • Application Type:
    Retention Permission
  • Application Status:
    Decision Notice Issued
  • Council Decision:
    GRANT RETENTION PERMISSION (Unknown)

Useful Links:

Development Description:

RETENTION: For the retention of works carried out, including the demolition of the original attic structure, the construction of a first-floor dormer-type structure over the full area of the rear roof of the existing house, a first-floor extension to the rear over the existing ground floor rear structure, the raising of the ridge level of the main roof to achieve habitable accommodation height, and all associated works. The retained works accommodate a new stairs, bedroom, bathroom, and storage area at first floor level.

Nearby Applications:

Appeals / Commencement

No Appeals Found

Decision Appealed:

  • Appeal Submitted:
  • Appeal Status:
  • Appeal Decision:
  • An Coimisiún Pleanála File Ref.:
  • Note: If an appeal has been lodged and information isn't showing then this means An Coimisiún Pleanála hasn't published the data for reuse by PlanningAlerts.ie. You will need to follow up directly on the ACP website. Use the reference number, above, if available.

No Commencement Found