Skip to main content

BLACK FRIDAY 2026: Subscriber plan now 50% off for the year. See plans

New application Permission

Part of the 'Nissan Site', to the east of Walkinstown Avenue at the junction of Walkinstown Avenue and Naas Road

Dublin City Council Received 30 Jun 2026

Proposed development

We, O’Flynn Construction Co. Unlimited Company intend to apply to Dublin City Council for permission for development at this c. 1.86-hectare site, part of the ‘Nissan Site’, to the east of Walkinstown Avenue at the junction of Walkinstown Avenue and Naas Road. The development will consist of amendments to a previously permitted (Reg. Ref. 3228/20, as amended by Reg. Refs. 3792/23 and WEB5179/25) mixed-use development.The development will consist of: I. Amendments to the basement with subsequent reduction of 47 sq.m. gross floor area. The amendments include combining bin storage areas, removal of a water storage tank, changes to vent sizes and locations, changes to and consolidation of plant room layouts, and revised lift/stair core and lobby layouts. II. Amendments at roof-level, including: a. Removal of previously permitted plant structures on Blocks F, G & K. b. Provision of safety railings, approximately 1.8 m above roof level, to accessible roof terraces on Blocks F, J, K, and L. c. Reduction in the extent of roof-mounted photovoltaic (PV) solar panels across Blocks I, J, and L due to the use of more efficient panels. III. Amendments to individual blocks, including: a. Block F: Increase in the overall building height by 0.76m. Building setback by 0.35m and central balconies recessed along the western façade to avoid encroachment into the ESB exclusion zone. Balconies on the apartments at the northwest corner on the western façade will be relocated to the northern façade to avoid extending into the ESB exclusion zone. Overall decrease of 100 sq.m. in the gross floor area. Minor changes will be made to fenestration and access arrangements. b. Block G: Reduction in the overall building height by 0.8m and reduction of 59 sq.m. gross floor area. To facilitate access to the ESB substation, the formation level will be -1.5m below the current level. Reduction in the number of lifts to 1 no., service risers will be amended, and the roof layout will be revised due to the removal of technical areas. Minor changes will be made to fenestration and access arrangements. c. Block H2: Increase of 181 sq.m. in gross floor area to accommodate ESB…

You’re reading part of this description. Subscribers see the full text of every application.

Timeline

  1. Application received
  2. Decision due

Application details

Application type
Permission
Council status
Registered Application
File number
Register updated
31 Jul 2026

Site and nearby applications

500 m

Guests see 500 m.

  • This site
  • New
  • Decision
  • Further info
  • Other

33 applications within 500 m