Skip to main content

BLACK FRIDAY 2026: Subscriber plan now 50% off for the year. See plans

Commencement notice Permission

3-4, Crag Avenue, Clondalkin Industrial Estate, Clondalkin, Dublin 22

South Dublin County Council Received 12 Jul 2023

Proposed development

Alterations to the development permitted under Reg. Ref.: SD18A/0068, as previously amended under Reg. Ref.: SD19A/0185 and Reg. Ref.: SD20A/0242, and to the development permitted under Reg. Ref.: SD20A/0309, as previously amended under Reg. Ref.: SD22A/0093. The proposed alterations in summary comprise the provision of an altered energy centre design and all associated development, along with minor alterations to the permitted site layout, provision of a gas AGI, and all ancillary works. The development, for which a 5-year planning permission is sought, will comprise the following: Construction of a revised energy centre in the western part of the subject site, to accommodate alternate generation technology, including 10 no. gas generation turbines (all with associated flues, 8 no. c. 33 metres (m) in height and 2 no. c. 15 m in height), 2 no. steam turbines including 2 no. steam turbine generator enclosure buildings with a gross floor area (GFA) of 219 sq.m each and a height of c. 6.2 m, associated steam turbine generator distribution and control structure with a GFA of 84 sq.m and an overall height of c. 4.2 m, and 2 no. steam turbine / air cooled condenser structures with a height of c. 25.4 m. Construction of 8 no. 33/20kV transformer bays to the southeast of the energy centre, with a further 12 no. gas / steam transformers to serve the proposed turbines to the west of the energy centre. Provision of 3 no. 13.6 m high fuel storage tanks, a fuel oil enclosure building (with a GFA of 50 sq.m and an overall height of c. 3.8m), a fire pump enclosure building (with a GFA of 65 sq.m and an overall height of c. 3.2 m) along with 3 no. c. 14.1 m high sprinkler tanks, a c. 14.5 m high water tank, and a water treatment plant building (with a GFA of 218 sq.m and a maximum height of c. 17 m including rooftop plant). Provision of 6 no. black-start / emergency generators to the south of the energy centre with an overall height of…

You’re reading part of this description. Subscribers see the full text of every application.

Timeline

  1. Application received
  2. Decision due
  3. Appeal lodged
  4. Decision
  5. Final grant
  6. Permission expires

A commencement notice has been lodged for this site.

Application details

Application type
Permission
Council status
Final Grant
Decision
Grant Permission
File number
Register updated
22 Oct 2026

Appeal to An Coimisiún Pleanála

Case number
318127
Lodged
29 Sep 2023
Status
Case is due to be decided by 12/02/2024

Site and nearby applications

500 m

Guests see 500 m.

  • This site
  • New
  • Decision
  • Further info
  • Other

19 applications within 500 m