1.8km |
10/04/2025 |
N/A |
Coolreagh or Cloghan Hill , Cloghan , Co. Offaly |
the construction of a dwelling house, domestic garage, new site entrance, septic tank treatment system, percolation area and all associated site works... login required. |
Details... |
1.8km |
21/03/2025 |
N/A |
Coolreagh or Cloghan Hill , Cloghan , Co. Offaly |
construction of a dwelling house, domestic garage, new site entrance, septic tank treatment system, percolation area and all associated site works... login required. |
Details... |
2.1km |
05/12/2024 |
CONDITIONAL |
Lumcloon , Cloghan , County Offaly |
The proposed development includes the construction of the following: (i) two new independent power provider (IPP) buildings, (ii) two new electrical transformers, (iii) additional air insulated switchgear (AIS) including four new 110kV bays, (v) connection to the grid via the existing 110kV Derrycarney substation, (vi) access to t... login required. |
Details... |
2.1km |
25/11/2024 |
N/A |
Lumcloon , Cloghan , County Offaly |
an extension to the existing Derrycarney 110kV Substation. The proposed development includes the construction of the following: (i) two new independent power provider (IPP) buildings, (ii) two new electrical transformers, (iii) additional air insulated switchgear (AIS) including four new 110kV bays, (v) connection to the grid via the existing 110kV Derrycarne... login required. |
Details... |
260m |
13/09/2024 |
CONDITIONAL |
LUMCLOON , CLOGHAN , CO. OFFALY |
CONSTRUCTION OF A NEW DWELLING HOUSE, DOMESTIC GARAGE/FUEL SHED, INSTALL EFFLUENT TREATMENT UNIT WITH SOIL POLISHING FILTER AND ALL ANCILLARY SITE WORKS... login required. |
Details... |
310m |
02/09/2024 |
CONDITIONAL |
LUMCLOON , CLOGHAN , CO.OFFALY |
CONSTRUCTION OF NEW DWELLING HOUSE, DOMESTIC GARAGE/FUEL SHED, INSTALL EFFLUENT TREATMENT UNIT WITH SOIL POLISHING FILTER AND ALL ANCILLERY SITE WORKS... login required. |
Details... |
2.2km |
14/09/2023 |
CONDITIONAL |
Lumcloon , Cloghan , Co. Offaly |
an extension to the existing battery energy storage system (BESS) facility (consented under Planning Ref 19/55) the proposed development includes the construction of the following: (i) Open area battery energy storage system (BESS) on lands adjoining the existing BESS facility to the east and south, containing a total of 112 modular battery containers and medium voltage power stations (MVPS). The propose... login required. |
Details... |
2.2km |
14/09/2023 |
N/A |
Lumcloon , Cloghan , Co. Offaly |
The proposed development includes the construction of the following: (i) Open area battery energy storage system (BESS) on lands adjoining the existing BESS facility to the east and south, containing a total of 112 modular battery containers and medium voltage power stations (MVPS). The proposed development will utilise the existing customer (IPP) b... login required. |
Details... |
2.3km |
17/08/2023 |
CONDITIONAL |
Lands within the townlands of Lumcloon and Falsk , Gallen , Co. Offaly |
The installation of a solar photovoltaic (PV) farm, including a Battery Energy Storage System (BESS) consisting of 48no. units and provision of a bridge crossing the Silver River, on 87.96Ha./217.37 acres of lands comprising 18no. agricultural fields on two separate land parcels within the townlands of Lumcloon and Falsk, Gallen Co. Offaly (E: 613500; N: 720000 – centre of site). The solar farm will consist of a series solar photovoltaic (PV) panels mounted on steel support structures to a height not greater than 3.00m. Development ancillary to the siting of solar PV panels includes 19no. transformers; pole-mounted CCTV cameras; underground cabling; deer fenceline measuring 2.00m high... login required. |
Details... |
2.3km |
03/08/2023 |
N/A |
Lands within the townlands of Lumcloon and Falsk , Gallen , Co. Offaly |
The installation of a solar photovoltaic (PV) farm, including a Battery Energy Storage System (BESS) consisting of 48no. units and provision of a bridge crossing the Silver River, on 87.96Ha./217.37 acres of lands comprising 18no. agricultural fields on two separate land parcels within the townlands of Lumcloon and Falsk, Gallen Co. Offaly (E: 613500; N: 720000 – centre of site). The solar farm will consist of a series solar photovoltaic (PV) panels mounted on steel support structures to a height not greater than 3.00m. Development ancillary to the siting of solar PV panels includes 19no. transformers; pole-mounted CCTV cameras; underground cabling; deer fenceline measuring 2.00m high... login required. |
Details... |
2.3km |
13/07/2023 |
N/A |
Lands within the townlands of Lumcloon and Falsk , Gallen , Co. Offaly |
The installation of a solar photovoltaic (PV) farm, including a Battery Energy Storage System (BESS) consisting of 48no. units and provision of a bridge crossing the Silver River, on 87.96Ha./217.37 acres of lands comprising 18no. agricultural fields on two separate land parcels within the townlands of Lumcloon and Falsk, Gallen Co. Offaly (E: 613500; N: 720000 – centre of site). The solar farm will consist of a series solar photovoltaic (PV) panels mounted on steel support structures to a height not greater than 3.00m. Development ancillary to the siting of solar PV panels includes 19no. transformers; pole-mounted CCTV cameras; underground cabling; deer fenceline measuring 2.00m high... login required. |
Details... |