Skip to main content

BLACK FRIDAY 2026: Subscriber plan now 50% off for the year. See plans

New application Permission

Galros East Whigsborough Ballycollin, and Eglish, County Offaly

Offaly County Council Received 28 Oct 2026

Proposed development

RENEWABLE ENERGY DIRECTIVE III (RED III) DEVELOPMENT.The proposed development (to be known as ‘Cush Wind Farm Phase II’) for which planning permission is sought will comprise: I.Three (3 no.) wind turbines with an overall ground-to-blade tip height ranging from 199.1 metres to 200 metres, a rotor diameter ranging from 158 metres to 175 metres, and a hub height ranging from 111.6 metres to 120.9 metres; II. Associated turbine foundations, crane hardstanding areas and temporary turbine component storage and assembly areas; III. Approximately 1.7 kilometres of new internal wind farm access tracks; IV.An electrical switch room building with a gross floor area of approximately 96.2 square metres, within a compound of approximately 429 square metres, enclosed by approximately 2.6 metre high palisade fencing and gates; V. Underground electrical and communications cabling connecting the proposed turbines to the adjoining permitted Cush Wind Farm (An Coimisiún Pleanála Reference ABP-318816-24) and to the proposed electrical switch room; VI. One (1 no.) site entrance from the L300321 local road to serve the electrical switch room; VII. Use of the construction phase site entrance from the N62 national road, the operation phase site…

You’re reading part of this description. Subscribers see the full text of every application.

Timeline

  1. Application received
  2. Decision due

Application details

Application type
Permission
Council status
New Application
File number
Register updated
17 Nov 2026

Site and nearby applications

500 m

Guests see 500 m.

  • This site
  • New
  • Decision
  • Further info
  • Other

0 applications within 500 m

No other applications within this distance.