Killough Quarry , Gaile Townland , Holycross Co. Tipperary

Jan 13 2025

Application Received

Mar 07 2025

Further Info. Requested

Dec 05 2025

Further Info. Received

Feb 06 2026

Decision

Feb 07 2026

Decision Due

Mar 05 2026

Appeal Submitted
  • Submitted: 13 / 01 / 2025
  • Application Type:
    PERMISSION
  • Application Status:
    APPEALED
  • Council Decision:
    REFUSED (Refused)

Useful Links:

Development Description:

1. An overall planning application site area of c. 6.3 hectares consisting of a proposed bio-renewables production facility, buffer screening, ancillary facilities and site access via the existing permitted quarry entrance. 2. The proposed bio-renewables production facility (incorporating anaerobic digestion) compound will cover an area of c. 4 hectares. The production facility will convert feedstocks to end of line co-products, namely bio-methane (gas), compressed bio-methane (bio-CNG), carbon dioxide (CO2), electricity (green), organic fertilisers (pelleted) and water, with integrated solar energy generation. The adjacent Roadstone Killough Quarry plant will utilise the electricity, bio-methane and water. Pelletised fertiliser will be available for supply to local agriculture and traders off-site. CNG and CO2 will be pressurised and stored for ongoing draw-off by tankers to points of re-use off-site. Demolition of existing quarry store building (c. 158m²) to facilitate the proposed development. 3. The facility will consist of the following elements to be constructed: a) two-storey administration building with (gross floor area 664m² and 8.15m in height) to accommodate reception and storage areas, canteen, laboratory, first aid room, control room/electrical switch room, storage room, toilets, offices, conference room, training room and kitchenette, and roof solar panels 315m²; b) dry matter reception building (gross floor area 5,215m² and 12.7m in height) with roof solar panels 4,000m²; c) workshop building (gross floor area 122.1m² and 8.9m in height) to accommodate workshop and internal gantry crane, store and office at ground level and office at mezzanine level; d) bio-conversion building (gross floor area 3,257m² and 12.5m in height) with roof solar panels 2,400m²; e) pre-treatment, equalisation and gas upgrading building (gross floor area 5,685m² and 12m in height) to accommodate pre-treatment & equalisation area (3,527m²), utilities area (376m²), heat recovery plant area (361m²), water treatment recovery area (316m²), and gas upgrading facility (1,105m²) with roof solar panels 3,850m²; f) digestate handling building (gross floor area 692m² and 8.6m in height) to accommodate palletiser station/packing station area (150m²), solid dryer/vacuum evaporator area (392m²) and nutrient adjustment facility (150m²); g) warehouse storage building (gross floor area 158m² and 11.2m in height); h) bio-filling station building (gross floor area 300m² and 9.75m in h

Nearby Applications:

Appeals / Commencement

No Appeals Found

Decision Appealed:

  • Appeal Submitted:
  • Appeal Status:
  • Appeal Decision:
  • An Coimisiún Pleanála File Ref.: 500924
  • Note: If an appeal has been lodged and information isn't showing then this means An Coimisiún Pleanála hasn't published the data for reuse by PlanningAlerts.ie. You will need to follow up directly on the ACP website. Use the reference number, above, if available.

No Commencement Found

Commencement Information:

Copyright:

Creative Commons LicensePlanning Data is published by Department of Housing, Planning and Local Government and is licensed under a Creative Commons Attribution-NoDerivatives 4.0 International License.