Coláiste Dún Iascaigh, Cashel Road, Cahir
Proposed development
Development which will consist of: a) Construction of three new extensions with a total combined floor area of 2,484m², comprising - (i) Extension 1 (2,367m²), a part single storey and part two storey extension to the west of the existing school building. Extension 1 comprises a 4no. classroom SEN base, 6 no. general classrooms, 4 no. specialist classrooms, 3no. SET rooms, as well as storage, toilets, locker/social spaces, and other ancillary accommodation. Extension 1 is connected to the existing school by two short link corridors. Extension 1 includes solar PV panels on the roof, and (ii) Extension 2 (58.5m²) and Extension 3 (58.5m²), both single storey extensions located within a service yard to the east of the existing school building. Extensions 2 and 3 are both technology preparation rooms and are attached directly to existing…
You’re reading part of this description. Subscribers see the full text of every application.
Timeline
- Application received
Application details
- Application type
- Permission
- Council status
- Incompleted Application
- File number
- Register updated
- 27 Oct 2026
Site and nearby applications
Guests see 500 m.
- This site
- New
- Decision
- Further info
- Other
22 applications within 500 m
- Decision Coláiste Dún Iascaigh, Cashel Road, Cahir Permission · Mar 24 20 m
- Decision Cashel Road, Cahir, Co. Tipperary Permission · Mar 15 2024 90 m
- Decision Barnora, Cashel Road, Cahir Permission · Aug 26 2025 130 m
- New Rosemount Farm Road, Barnora, Cahir Permission · Oct 9 150 m
- Commenced Rosemount Farm Road, Barnora Cahir, Co. Tipperary Permission · Feb 25 150 m
- Decision Colaiste Dun Iascaigh, Cashel Road, Co. Tipperary Permission · Mar 20 160 m
- New Colaiste Dun Iascaigh, Cashel Road, Co. Tipperary Permission · Oct 23 2025 210 m
- New 14 Rosemount Drive, Cahir, Co.Tipperary Permission · Jun 19 2024 230 m
- New 14 Rosemount Drive, Cahir, Co. Tipperary Permission · Jun 14 2024 230 m
- Decision 14 Rosemount Drive, Cahir, Co.Tipperary Permission · Aug 16 2024 240 m
- Decision Barnora, Cashel Road, Cahir Extension Of Duration · Feb 4 340 m
- FI received Site 18 Townparks, Clonmel Road, Cahir Co. Tipperary Retention · Oct 23 340 m