2.6km |
12/04/2024 |
N/A |
Ballygambon Lower , Cappagh Dungarvan , Co. Waterford |
for Internal alterations and the construction of an single storey extension to the North of the existing house, and all associated site works at ... login required. |
Details... |
270m |
14/12/2023 |
CONDITIONAL |
Woodstock , Cappoquin , Co. Waterford |
for the construction of a detached timber-frame dwelling, wastewater bio treatment tank and raised soil polishing percolation area, potable well, vehicular entrance and all associated site works... login required. |
Details... |
2km |
01/11/2023 |
CONDITIONAL |
Ballynicole , Villierstown Cappoquin , Co. Waterford. |
New Single storey Dwelling together with a detached Garage, new entrance, bore well, septic tank, percolation area and ancillary site works.... login required. |
Details... |
2.9km |
05/10/2023 |
CONDITIONAL |
Ballymulalla East , Cappagh , Co. Waterford |
two Storey Dwelling House, entrance, septic tank, percolation area and all ancillary site works at Ballymulalla East, Cappagh, Co. Waterford... login required. |
Details... |
2.4km |
08/09/2023 |
CONDITIONAL |
Keereen Upper Woodhouse or Tinakilly and Knocknamona , Dungarvan , County Waterford |
for development comprising of : a) 1940m of underground electrical cabling in Keereen Upper and Knocknamona townlands, linking Knocknamona Windfarm (to be constructed) to the Woodhouse Substation (operational). b) Works within the existing Woodhouse Substation compound in Keereen Upper, comprising a new control building 5.3m X 3.8m and 4.6m high; a 110kV electrical transformer c.6m in height, with associated plinth and bund; an electrical transformer bay; 2 No. lightening masts 17.5m in height and ancillary electrical equipment. Works within the Woodhouse Substation compound will also include a new access track 17m long and 4.5m in width; additional p... login required. |
Details... |
2.9km |
06/07/2023 |
CONDITIONAL |
Ballingowan East , Villierstown , Co. Waterford |
for temporary installation of a new metal roof on the existing perished thatched roof on cottage (protected structure)for the rebuilding of the top of the external walls, for re-plastering the existing external walls in lime both internally and externally, for the reinstatement of a new timber roof structure, for t... login required. |
Details... |
1.5km |
01/03/2023 |
CONDITIONAL |
Woodstock , Cappoquin , Co. Waterford |
for an extension to the rear of the existing house along with all associated site works... login required. |
Details... |
2.9km |
28/02/2023 |
CONDITIONAL |
Ballynameelagh , Cappagh , Co Waterford |
for construction of a new single storey dwelling, integrated garage, new entrance (to access existing shared driveway), new wastewater treatment system and all ancillary works. Planning Permission is also required to alter site boundaries from that granted under file ref. no. 05/1803... login required. |
Details... |
830m |
22/02/2023 |
CONDITIONAL |
Knocknaskagh Upper , Cappoquin , Co. Waterford |
demolition of a conservatory & construction of an extension to existing dwelling, replacement of windows with minor alterations to select window openings, addition of stone cladding to existing bay windows & all associated works... login required. |
Details... |
1km |
17/11/2022 |
CONDITIONAL |
Kilmagabbogue , Villierstown , Cappoquin |
the construction of a new single storey house, a garage, stables, a water waste treatment system, a bored well and an entrance along with all associated site works ... login required. |
Details... |
1.1km |
01/11/2022 |
CONDITIONAL |
Knocknaskagh Upper , Cappoquin , Co. Waterford |
change of use from existing retail and industrial use of existing detached building to residential use. Permission is required for internal amendments, front façade amendments, installation of new windows, construct... login required. |
Details... |
2.9km |
18/10/2022 |
N/A |
Ballynameelagh , Cappagh , Co. Waterford |
construction of a new single storey dwelling, integrated garage, new entrance (to access existing shared driveway), new wastewater treatment system and all ancillary works... login required. |
Details... |
0m |
22/08/2022 |
REFUSED |
Woodstock and Kereen Lower , Cappoquin , Co. Waterford |
for the recycling of construction and demolition materials within the footprint of the existing quarry. The development involves an activity that requires a waste facility permit. An Environmental Impact Assessment Report (EIAR) will be submitted to the planning authority with the application... login required. |
Details... |
0m |
05/08/2022 |
N/A |
Kereen Lower , Cappoquin , Co. Waterford |
for the recycling of construction and demolition materials within the footprint of the existing quarry. The development involves an activity that requires a waste facility permit. An Environmental Impact Assessment Report (EIAR) will be submitted to the planning authority with the application... login required. |
Details... |
0m |
08/06/2022 |
N/A |
Woodstock and Kereen Lower , Cappoquin , Co. Waterford |
PERMISSION for the recycling of construction and demolition materials within the footprint of the existing quarry. The development involves an activity ... login required. |
Details... |
1.6km |
31/05/2022 |
REFUSED |
Knocknaskagh Upper , Clonkerdin , Cappoquin |
construction of a new 2-storey dwelling, new wastewater treatment system and percolation area, new entrance driveway and temporary mobile home... login required. |
Details... |
1.3km |
18/05/2022 |
CONDITIONAL |
Ballingowan East , Villerstown , Capoquin |
for construction of single-storey detached dwelling house, detached garage, septic tank and percolation area, vehicular entrance, site works, site boundaries and all ancillary works... login required. |
Details... |
1.3km |
09/03/2022 |
N/A |
Ballingowan East , Villierstown , Cappoquin |
construction of single-storey detached dwelling house, detached garage, septic tank and percolation area, vehicular entrance, site works, site boundaries and all ancillary works... login required. |
Details... |
80m |
23/02/2022 |
REFUSED |
Kereen Lower , Cappoquinn , Co. Waterford |
Extension of Duration to Planning File 17/160 to extend the infill part of the exhausted quarry with inert material and an area to recycle construction materials. The activity involves an activity that requires a waste facility permit... login required. |
Details... |