1.3km |
14/12/2023 |
CONDITIONAL |
Woodstock , Cappoquin , Co. Waterford |
for the construction of a detached timber-frame dwelling, wastewater bio treatment tank and raised soil polishing percolation area, potable well, vehicular entrance and all associated site works... login required. |
Details... |
2.7km |
01/11/2023 |
CONDITIONAL |
Ballynicole , Villierstown Cappoquin , Co. Waterford. |
New Single storey Dwelling together with a detached Garage, new entrance, bore well, septic tank, percolation area and ancillary site works.... login required. |
Details... |
2.2km |
18/05/2023 |
N/A |
Springfield , Carrigeen , Cappoquin |
the construction of a general purpose shed for a tillage farm to store grain and straw and ancillary works (i.e. concrete yards and farmyard access road - all for agricultural purposes only) in a new farmyard with new farm entrance.
One building is proposed with an overall height of 9.96 meters.... login required. |
Details... |
3km |
02/05/2023 |
CONDITIONAL |
Ballyhane , Cappoquin , Co. Waterford |
construction of (I) Milking parlour building incorporating holding yard with crush/ drafting yard, meal bin, Office, flow channel, storage rooms and plant rooms with underground effluent tanks (ii) New agricultural entrance with access roadway and hardcore area and all associated site works... login required. |
Details... |
2.2km |
03/04/2023 |
N/A |
Springfield , Carrigeen , Cappoquin |
the construction of a general purpose shed for a tillage farm to store grain and straw and ancillary works (i.e. concrete yards and farmyard access road - all for agricultural purposes only) in a new farmyard with new farm entrance... login required. |
Details... |
1.3km |
22/02/2023 |
CONDITIONAL |
Knocknaskagh Upper , Cappoquin , Co. Waterford |
demolition of a conservatory & construction of an extension to existing dwelling, replacement of windows with minor alterations to select window openings, addition of stone cladding to existing bay windows & all associated works... login required. |
Details... |
1.7km |
17/11/2022 |
CONDITIONAL |
Kilmagabbogue , Villierstown , Cappoquin |
the construction of a new single storey house, a garage, stables, a water waste treatment system, a bored well and an entrance along with all associated site works ... login required. |
Details... |
1.4km |
01/11/2022 |
CONDITIONAL |
Knocknaskagh Upper , Cappoquin , Co. Waterford |
change of use from existing retail and industrial use of existing detached building to residential use. Permission is required for internal amendments, front façade amendments, installation of new windows, construct... login required. |
Details... |
1.5km |
22/08/2022 |
REFUSED |
Woodstock and Kereen Lower , Cappoquin , Co. Waterford |
for the recycling of construction and demolition materials within the footprint of the existing quarry. The development involves an activity that requires a waste facility permit. An Environmental Impact Assessment Report (EIAR) will be submitted to the planning authority with the application... login required. |
Details... |
1.5km |
05/08/2022 |
N/A |
Kereen Lower , Cappoquin , Co. Waterford |
for the recycling of construction and demolition materials within the footprint of the existing quarry. The development involves an activity that requires a waste facility permit. An Environmental Impact Assessment Report (EIAR) will be submitted to the planning authority with the application... login required. |
Details... |
1.5km |
08/06/2022 |
N/A |
Woodstock and Kereen Lower , Cappoquin , Co. Waterford |
PERMISSION for the recycling of construction and demolition materials within the footprint of the existing quarry. The development involves an activity ... login required. |
Details... |
1.8km |
31/05/2022 |
REFUSED |
Knocknaskagh Upper , Clonkerdin , Cappoquin |
construction of a new 2-storey dwelling, new wastewater treatment system and percolation area, new entrance driveway and temporary mobile home... login required. |
Details... |
1.5km |
27/05/2022 |
N/A |
Woodstock and Kereen Lower , Cappoquin , Co. Waterford |
the recycling of construction and demolition materials within the footprint of the existing quarry. The development involves an activity that requires a waste facility permit. An Environmental Impact Assessment Report (EIAR) will be submitted to the planning authority with the application... login required. |
Details... |
1.1km |
18/05/2022 |
CONDITIONAL |
Ballingowan East , Villerstown , Capoquin |
for construction of single-storey detached dwelling house, detached garage, septic tank and percolation area, vehicular entrance, site works, site boundaries and all ancillary works... login required. |
Details... |
1.1km |
09/03/2022 |
N/A |
Ballingowan East , Villierstown , Cappoquin |
construction of single-storey detached dwelling house, detached garage, septic tank and percolation area, vehicular entrance, site works, site boundaries and all ancillary works... login required. |
Details... |
1.6km |
23/02/2022 |
REFUSED |
Kereen Lower , Cappoquinn , Co. Waterford |
Extension of Duration to Planning File 17/160 to extend the infill part of the exhausted quarry with inert material and an area to recycle construction materials. The activity involves an activity that requires a waste facility permit... login required. |
Details... |
1.3km |
10/02/2022 |
N/A |
Knocknaskagh Upper , Cappoquin , Co. Waterford |
Retention Permission and Permission for development which will consist/consists of. RETENTION of existing front porch as constructed. The change of use from existing retail and industrial use of existing detached building to residential use. Permission is required for i... login required. |
Details... |
1.4km |
18/01/2022 |
N/A |
Knocknaskagh Upper , Cappoquin , Co. Waterford |
PERMISSION and RETENTION for development at this site which will consist/consists of: RETENTION of existing front porch as constructed. PERMISSION for change of use from existing retail and industrial use of existing detached building to residential use. PERMISSION is required for... login required. |
Details... |
2.2km |
13/10/2021 |
CONDITIONAL |
Ballingown West , Villierstown , Co. Waterford |
construct a New Single-Storey dwelling with a Basement together with detached Garage new entrance, treatment system, percolation area, bore well and ancillary site works... login required. |
Details... |