Skip to main content
Our Subscriber Plan is now 50% off Discount expires on Saturday, 01 August 2026. Get in touch about our Business Accounts and generate a free test alert.

Kilbane Killeagy (Ryan) Shannaknock Killeagy (Stritch) , Killeagy (Goonan) Ballymoloney Magherareagh and Lackareagh Beg , Co. Clare.

Aug 21 2024

Application Received
  • Submitted: 21 / 08 / 2024
  • Application Type:
    PERMISSION
  • Application Status:
    INCOMPLETED APPLICATION
  • Council Decision:
    N/A (Unknown)

Useful Links:

Development Description:

a ten-year planning permission for development at a site in the townlands of Kilbane, Killeagy (Ryan), Shannaknock, Killeagy (Stritch), Killeagy (Goonan), Ballymoloney, Magherareagh and Lackareagh Beg, Co Clare. The development will consist of: (i) The construction of 7 No. wind turbines with the following parameters: a. Total tip height range of 179.5m - 180m, b. Rotor diameter range of 149m - 155m, c. Hub height range of 102.5m to 105m; (ii) Construction of associated foundations, hardstand and assembly areas; (iii) All associated wind farm underground electrical and communications cabling connecting the turbines and mast to the proposed electrical substation; (iv) Construction of 1 No. permanent 38kV electrical substation including a single-storey control building with welfare facilities, all associated electrical plant and equipment, security fencing, entrance on to new access road, all associated internal underground cabling, drainage infrastructure, wastewater holding tank, retention separator tank and all ancillary works, in the townland of Killeagy (Goonan), Co Clare; (v) A Battery Energy Storage System within the 38kV electrical substation compound; (vi) 1 No. permanent meteorological mast of c. 36.5m in height, associated foundation and hard-standing area in the townland of Shannaknock; (vii) The permanent upgrade of 1 No. existing site entrance off the L7080 ('The Gap Road') for the provision of construction and operational access; (viii) Provision of 3 No. new permanent site entrances off the L7080 for the provision of construction and operational access; (ix) Provision of 3 No. new temporary site entrances off the L7080 for the provision of construction access; (x) Upgrade of existing tracks/roads, including the L7080, and the provision of new site access roads, 4 No. watercourse crossings, junctions and hardstand areas; (xi) 1 No. temporary construction compound with temporary offices and staff facilities in the townland of Killeagy (Goonan); (xii) 1 No. temporary storage area in the townland of Killeagy (Goonan); (xiii) 1 No. borrow pit in the townland of Killeagy (Goonan); (xiv) Peat and Spoil Management; (xv) Tree Felling to accommodate the construction and operation of the proposed development; (xvi) Operational stage site and amenity signage; and (xvii) All ancillary apparatus and site development works above and below ground, including soft and hard landscaping and drainage infrastructure. A 10-year planning permission and 35-year ope

Nearby Applications:

Appeals / Commencement

No Appeals Found

Decision Appealed:

  • Appeal Submitted:
  • Appeal Status:
  • Appeal Decision:
  • An Coimisiún Pleanála File Ref.:
  • Note: If an appeal has been lodged and information isn't showing then this means An Coimisiún Pleanála hasn't published the data for reuse by PlanningAlerts.ie. You will need to follow up directly on the ACP website. Use the reference number, above, if available.

No Commencement Found

Commencement Information:

Copyright:

Creative Commons LicensePlanning Data is published by Department of Housing, Planning and Local Government and is licensed under a Creative Commons Attribution-NoDerivatives 4.0 International License.