Ballygerry West , Co Clare

Aug 26 2022

Application Received

Oct 18 2022

Further Info. Requested

Dec 20 2022

Withdrawn
  • Submitted: 26 / 08 / 2022
  • Application Type:
    PERMISSION
  • Application Status:
    WITHDRAWN
  • Council Decision:
    N/A (Unknown)

Useful Links:

Development Description:

for development which will consist of a 10 year planning permission for the construction of a: 1. enclosed battery energy storage system compound on a total of up to c.7.8-hectare site, to include: 1 no. TSO electrical substation building and 1 no. single storey customer substation, control and switch rooms, up to 19 battery storage block on concrete support structures including heating, ventilation and air conditioning unit (HVAC units) transformer and inverter units. Including access tracks and site entrance, associated electrical cabling and ducting, security gates, perimeter security fencing, CCTV system, landscaping works and all associated ancillary infrastructure

Nearby Applications:

Appeals / Commencement

No Appeals Found

Decision Appealed:

  • Appeal Submitted:
  • Appeal Status:
  • Appeal Decision:
  • An Coimisiún Pleanála File Ref.:
  • Note: If an appeal has been lodged and information isn't showing then this means An Coimisiún Pleanála hasn't published the data for reuse by PlanningAlerts.ie. You will need to follow up directly on the ACP website. Use the reference number, above, if available.

No Commencement Found

Commencement Information:

Copyright: