2.6km |
02/12/2019 |
CONDITIONAL |
BALLINRATH , EDENDERRY , CO OFFALY |
(A)1 NO NEW STOREY AND HALF TYPE DWELLING, (B) 1 NO. NEW DOMESTIC GARAGE (C) INSTALLATION OF A NEW WASTE WATER TREATMENT SYSTEM (D) NEW VEHICULAR ENTRANCE (E) NEW LANDSCAPING AND ALL ASSOCIATED SITE DEVELOPMENT WORKS... login required. |
Details... |
1.4km |
28/11/2019 |
N/A |
BALLYKILLEEN SHEAN KILCUMBER CLONCANT AND CUSHALING , EDENDERRY , CO OFFALY |
A 10-YEAR PLANNING PERMISSION WITH A 30-YEAR OPERATIONAL LIFE FOR DEVELOPMENT ON A SITE AREA OF 60.674 HECTARES. THE DEVELOPMENT WILL CONSIST OF UP TO 8 ( EIGHT) WIND TURBINES WITH A TIP HEIGHT OF UP TO 187 METRES, AND ALL ASSOCIATED FOUNDATIONS AND HARDSTANDING AREAS; APPROXIMATELY 4,750 METRES OF NEW INTERNAL ACCESS ROADS, ASSOCIATED DRAINAGE AND TURNING AREAS; UPGRADE OF APPROXIMATELY 3,500 METRES OF THE EXISTING L50062 PUBLIC ROAD INCLUDING UPGRADE OF THE EXISTING BRIDGE; A NEW BRIDGE CROSSING OF THE FIGILE RIVER TO PROVIDE ACCESS BETWEEN TURBINE 3 AND TURBINE 4; A 2,950-METRE RECREATION TRAIL AND ALL ASSOCIATED DEVELOPMENT TO INCLUDE GRAVEL PATHWAYS, A FOOTBRIDGE ACROSS THE FIGILE RIVER, A PARKING AREA, SIGNAGE, INFORMATION BOARDS AND OUTDOOR FITNESS EQUIPMENT; AN OFF-SITE ELECTRICAL SUBSTATION AND A BATTERY ENERGY STORAGE FACILITY; ALL ASSOCIATED UNDERGROUND ELECTRICAL AND COMMUNI... login required. |
Details... |
2.9km |
12/11/2019 |
CONDITIONAL |
BALLYKILLEEN , EDENDERRY , CO OFFALY |
(A) (I) SINGLE STOREY EXTENSION TO THE REAR OF THE EXISTING DWELLING HOUSE COMPRISING OF 61.4 SQ/M (II) PORCH AREA TO FRONT OF DWELLING COMPRISING OF 3.9 SQ/M (III) EXTERNAL GYM AREA COMPRISING OF 24 SQ/M (IV) EXTERNAL STUDY/ LIBRARY AREA COMPRISING OF 33 SQ/M (V) EXTERNAL UTILITY ROO... login required. |
Details... |
90m |
08/11/2019 |
N/A |
BALLYKILLEEN SHEAN KILCUMBER CLONCANT CUSHALING AND RATHMORE EDENDERRY , AND BALLINA GEASHILL , CO OFFALY AND TICKNEVIN CARBURY CO. KILDARE |
A 10-YEAR PLANNING PERMISSION WITH A 30-YEAR OPERATIONAL LIFE FOR DEVELOPMENT ON A TOTAL SITE AREA OF 63.9 HECTARES . THE DEVELOPMENT WILL CONSIST OF UP TO 9 NO. WIND TURBINES (8 IN CO. OFFALY, 1 IN CO. KILDARE), WITH A TIP HEIGHT OF UP TO 187 METRES, AND ALL ASSOCIATED FOUNDATIONS AND HARDSTANDING AREAS; APPROXIMATELY 4,750 METRES OF NEW INTERNAL ACCESS ROADS, ASSOCIATED DRAINAGE AND TURNING AREAS; UPGRADE OF APPROXIMATELY 3,500 METRES OF THE EXISTING L50062 PUBLIC ROAD INCLUDING UPGRADE OF THE EXISTING BRIDGE; A NEW BRIDGE CROSSING OF THE FIGILE RIVER TO PROVIDE ACCESS BETWEEN TURBINE 3 AND TURBINE 4; A 2,950-METRE RECREATION TRAIL AND ALL ASSOCIATED DEVELOPMENT TO INCLUDE GRAVEL PATHWAYS, A FOOTBRIDG... login required. |
Details... |
720m |
25/10/2019 |
CONDITIONAL |
BALLYKILLEEN NORTH OF EDENDERRY POWER STATION , IN THE TOWNLAND OF BALLYKILLEEN , CO OFFALY |
THE ERECTION AND OPERATION OF A MULTI-USER TELECOMMUNICATIONS MAST TO BE UTILISED AS PART OF THE NATIONAL BROADBAND PLAN, COMPRISING A 45-METRE LATTICE ST... login required. |
Details... |
160m |
23/10/2019 |
CONDITIONAL |
BALLYKILLEEN , EDENDERRY , CO OFFALY |
ALTERATIONS TO THE EXISTING 110KV CUSHALING SUBSTATION AND INCLUDES THE INSTALLATION OF 110KV AIS SWITCHGEAR WITH ASSOCIATED FOUNDATIONS, STEELWORK, SUPPORTS AND CONNECTORS AND ASSOCIATED WORKS... login required. |
Details... |
2.6km |
03/04/2019 |
CONDITIONAL |
BALLINRATH , EDENDERRY , CO OFFALY |
CONSTRUCTION OF A SINGLE STOREY DWELLING AND A DOMESTIC GARAGE AND A WASTE WATER TREATMENT SYSTEM AND A NEW SITE ENTRANCE AND ALL ASOCIATED SITE WORKS... login required. |
Details... |
2.6km |
08/03/2019 |
CONDITIONAL |
BALLYKILLEEN , EDENDERRY , CO. OFFALY |
THE CONSTRUCTION OF A NEW SINGLE STOREY DWELLING HOUSE AND DETACHED FUEL/ STORAGE/ GARAGE BUILDING, NEW WASTE WATER TREATMENT PLANT AND PERCOLATION AREA, NEW SITE ENTRANCE, REVISIONS TO FRONT BOUNDARY AND ALL ANCILLARY SITE WORKS... login required. |
Details... |
2.7km |
22/02/2019 |
N/A |
BALLYKILLEEN , EDENDERRY , CO. OFFALY |
CONSTRUCTION OF A NEW SINGLE STOREY DWELLING HOUSE AND DETACHED FUEL/STORAGE/GARAGE BUILDING, NEW WASTE WATER TREATMENT PLANT AND PERCOLATION AREA, NEW SITE ENTRANCE, REVISIONS TO FRONT BOUNDARY AND ALL ANCILLARY SITE WORKS... login required. |
Details... |