CROCKAHENNY , LEAMACROSSAN HILL , INISHOWEN LIFFORD PO
-
Submitted: 24 / 10 / 2025
-
Application Type:
PERMISSION -
Application Status:
INCOMPLETED APPLICATION -
Council Decision:
N/A (Unknown)
Useful Links:
Development Description:
A 10-YEAR PLANNING PERMISSION FOR THE CONSTRUCTION OF TWO WIND TURBINES WITHIN THE LANDHOLDING OF THE CROCKAHENNY WINDFARM AND ALL ASSOCIATED WORKS INCLUDING TWO WIND TURBINES THAT WILL HAVE AN OVERALL BLADE TIP HEIGHT OF UP TO 135 METRES; SITE WORKS INCLUDING THE CONSTRUCTION OF WIND TURBINE FOUNDATIONS, TURBINE HARD STANDINGS AND ASSEMBLY AREAS WITH ASSOCIATED DRAINAGE; A PROPOSED 38 KV ELECTRICAL SUBSTATION TO REPLACE THE EXISTING ELECTRICAL SUBSTATION AND CONTINUED USE OF THE EXISTING ELECTRICAL COMPOUND; TWO EXTENSIONS OF THE EXISTING ACCESS TRACKS WITHIN THE SITE; INSTALLATION OF UNDERGROUND ELECTRICAL CABLE IN EXISTING ELECTRICAL DUCTS AND ALL ASSOCIATED SITE DEVELOPMENT AND ANCILLARY WORKS. THE PROPOSED WIND TURBINES WILL CONNECT TO THE PROPOSED SUBSTATION AND WILL AVAIL OF THE EXISTING TRACKS AND ENTRANCE. THE PROPOSED DEVELOPMENT WILL HAVE A 30 YEAR OPERATIONAL LIFE FROM THE DATE OF COMMISSIONING. THE DEVELOPMENT IS COVERED BY THE PROVISIONS OF THE (RED III) RENEWABLE ENERGY DIRECTIVE III (DIRECTIVE 2023/2413)
Nearby Applications:
Appeals / Commencement
No Appeals Found
Decision Appealed:
- Appeal Submitted:
- Appeal Status:
- Appeal Decision:
- An Coimisiún Pleanála File Ref.:
- Note: If an appeal has been lodged and information isn't showing then this means An Coimisiún Pleanála hasn't published the data for reuse by PlanningAlerts.ie. You will need to follow up directly on the ACP website. Use the reference number, above, if available.
No Commencement Found
Commencement Information:
- Notice Submitted:
- Start Date:
- BCMS Notice:
- View on BCMS Website
Copyright:
Planning Data is published by Department of Housing, Planning and Local Government and is licensed under a Creative Commons Attribution-NoDerivatives 4.0 International License.