2.2km |
11/03/2024 |
N/A |
COLL AUTOS , MEENANILLER , DERRYBEG |
(1) ADDITIONAL FLOOR SPACE TO EXISTING GARAGE AND RELOCATION OF POSITION FROM THAT PREVIOUSLY APPROVED UNDER PLANNING REF. NO. 14/50044, (2) OFFICE FOR TEMPORARY USE, (3) TEMPORARY STORAGE CONTAINERS AND LEAN TO AND (4) EXTENSION ... login required. |
Details... |
2.9km |
11/03/2024 |
CONDITIONAL |
AONAD 27 PÁIRC GHNÓ GHAOTH DOBHAIR , ARD NA NCEAPAIRÍ , DOIRÍ BEAGA |
(1) ATHRUITHE INGEARCHLÓ ÓN MÉID A BHÍ CEADAITHE ROIMHE SEO FAOI TAGAIRT D'IARRATAS PLEANÁLA 19/51691, 20/51071 AGUS 22/51786, (2) SPÁS URLÁIR COIMHDEACH INMHEÁNACH BREISE, (3) LEASUITHE AR LEAGAN AMACH AN GCARRCHLÓS ÓN MÉID A BHÍ CEADAITHE ROIMHE SEO FAOI TAGAIRT D'IARRATAS PLEANÁLA 20/51071... login required. |
Details... |
2.2km |
29/02/2024 |
N/A |
COLL AUTOS , MEENANILLER , DERRYBEG |
(1) ADDITIONAL FLOOR SPACE TO EXISTING GARAGE AND RELOCATION OF POSITION FROM THAT PREVIOUSLY APPROVED UNDER PLANNING REF: 14/50044 (2) OFFICE FOR TEMPORARY USE (3) TEMPORARY STORAGE CONTAINERS AND LEAN TOO (4) EXTENSION OF ... login required. |
Details... |
1.9km |
26/02/2024 |
N/A |
MAGHERACLOGHER , BUNBEG , CO DONEGAL |
(1) RETENTION AND COMPLETION OF EXISTING GROUNDWORKS AND (2) ERECTION OF A BOUNDARY WALL ON THE SOUTHERN SIDE OF SITE WITH ALL OTHER ASSOCIATED SITE DEVELOPMENT WORKS... login required. |
Details... |
1.6km |
26/02/2024 |
CONDITIONAL |
ARDNAGAPPERY , DERRYBEG , CO. DONEGAL |
EXISTING ACCESS ROAD AND ENTRANCE FROM PROPERTY ON TO THE FACTORY ROAD... login required. |
Details... |
1.9km |
08/02/2024 |
N/A |
ÓSTÁN GHAOTH DOBHAIR , BÓTHAR NA TRÁ , AN BUN BEAG |
(1) DEMOLITION OF EXISTING STAIRCORE (46.5 SQ/M) ON THE EAST ELEVATION AND REPLACEMENT WITH NEW STAIRCORE (198 SQ/M) FROM LOWER GROUND FLOOR LEVEL TO THE PROPOSED NEW SECOND FLOOR LEVEL WITH NEW PLANT ROOM AT LOWER GROUND FLOOR LEVEL AND NEW HOUSEKEEPING/STORAGE ROOMS AT GROUND, FIRST AND SECOND FLOOR LEVELS, (2) REFURBISHMENT OF EXISTING PART TWO STOREY, PART THREE STOREY CONCRETE STRUCTURE, (3) ALTERATIONS TO INTERNAL LAYOUTS AT EXISTING LOWER GROUND FLOOR, GROUND FLOOR AND FIRST FLOOR LEVELS (3,003 SQ/M) PROVIDING NEW RECEPTION/ADMINISTRATION AREA, BAR/RESTAURANT, CUSTOMER TOILET/KITCHEN/STAFF FACILITIES/PLANT AND 69 GUEST BEDROOMS, (4) PROPOSED NEW ADDITIONAL SECOND FLOOR (1,337 SQ/M) ABOVE EXISTING BUILDING INCORPORATING NEW FULLY SERVICED WEDDING VENUE/FUNCTION ROOM, BAR/RESTAURANT PLUS OUTDOOR TERRACE AREA, (5) PROPOSED NEW THREE STOREY EXTENSION (2,029 SQ/M) ATTACHED TO THE NORTH EAST OF THE EXISTING BUILDING TO PROVIDE 11 NEW GUEST BEDROOMS (80 IN TOTAL) AND 15 NO. NEW TWO BEDRO... login required. |
Details... |
2.2km |
25/01/2024 |
UNCONDITIONAL |
AN CHARRAIG , NA DOIRÍ BEAGA , LEITIR CEANAINN |
SÍNEADH A CHUIR LEIS AN SEOMRA FEISTÍS ATÁ ANSIN CHEANNA FHÉIN, ÚASGHRADÚ A DHÉANAMH AR AN PAIRC TRAENÁLA, SCONSA DÉ TRÍ MEADAIR AR AIRDE A CHUIR TIMPEALL AN PAIRC TRAENÁLA, COMHARTHAÍ ÚRA AGUS OIBREACHA SUÍOMH A DHÉANAMH ... login required. |
Details... |
1.7km |
29/11/2023 |
N/A |
MAGHERACLOGHER , BUNBEG , GWEEDORE |
ERECTION OF COMMERICAL STORAGE SHED ADJACENT TO AN EXISTING BUILDING ALONG WITH A PERIMETER FENCE AND ALL ASSOCIATED SITE DEVELOPMENT WORKS... login required. |
Details... |
2.5km |
01/09/2023 |
CONDITIONAL |
CARRICKMCCAFFERTY , DERRYBEG , LETTERKENNY PO |
DEMOLITION OF A DWELLING HOUSE AND RECONSTRUCTION OF A NEW DWELLING HOUSE WITH INSTALLATION OF A WASTE WATER SYSTEM AND ALL ASSOCIATED SITE WORKS... login required. |
Details... |
1.2km |
31/08/2023 |
CONDITIONAL |
MACHAIRE GATHLÁN , DOIRÍ BEAGA , LEITIR CEANNAIN |
SÍNEADH A CHUIR LEIS AN SEID STÓRALA ATA ANN CHEANNA FÉIN A BHÍ CEADDAITHE FAOÍ UIMHIR TAGRATHA 07/31268 LE GACH SAOTHAR FORBARTHA LÁITHREÁIN GAOLMHAR EILE... login required. |
Details... |
1.1km |
28/07/2023 |
CONDITIONAL |
AN LUINNEACH , NA DOIRÍ BEAGA , LEITIR CEANNAIN |
GARÁISTE AONAR, DE STÓR GO LEITH A THÓGAIL CHOMH MAITH LEIS NA HOIBREACHA SUÍOMH UILIG A BHAINEANN LEIS... login required. |
Details... |
1.6km |
27/07/2023 |
CONDITIONAL |
MAGHERACLOGHER , BUNBEG , LETTERKENNY PO |
CONSTRUCTION OF A PHASE 2 TO PREVIOUSLY PERMITTED HOUSING DEVELOPMENT UNDER PLANNING REF. NO. 19/50721 WHICH CONSISTS OF CONSTRUCTION OF (1) 4 NO. ADDITIONAL SEMI-DETACHED SINGLE STOREY (2 BED) DWELLING UNITS AND (2) 1 NO. DETACHED GROUP HOME IN LIEU OF THAT P... login required. |
Details... |
1.2km |
26/07/2023 |
CONDITIONAL |
MEENANILLER , DERRYBEG , LETTERKENNY PO |
ERECTION OF A DWELLING HOUSE WITH SOIL POLISHING FILTER AND ALL OTHER ASSOCIATED SITE DEVELOPMENT WORKS... login required. |
Details... |
1.1km |
28/06/2023 |
CONDITIONAL |
STRAND ROAD , ARDNAGAPPERY , DERRYBEG LETTERKENNY PO |
NEW DOMESTIC GARAGE WITH ALL ASSOCIATED SITE WORKS... login required. |
Details... |
2.7km |
13/06/2023 |
CONDITIONAL |
CARRICK TD , DERRYBEG , LETTERKENNY PO |
CONSERVATORY BUILT TO EXISTING DWELLING HOUSE AND ALL ASSOCIATED SITE DEVELOPMENT WORKS... login required. |
Details... |
1.6km |
09/06/2023 |
N/A |
MAGHERACLOGHER , BUNBEG , LETTERKENNY PO |
CONSTRUCTION OF 5 NO. ADDITIONAL SINGLE STOREY 2 BEDROOM DWELLING UNITS (4 NO. SEMI-DETACHED, 1 NO. DETACHED) AS A PHASE 2 TO THE PREVIOUSLY GRANTED HOUSING DEVELOPMENT UNDER PLANNING REF NO. 19/50721. PHASE 2 ... login required. |
Details... |
2.2km |
31/05/2023 |
CONDITIONAL |
CARRICK , DERRYBEG , LETTERKENNY PO |
CONSTRUCTION OF DWELLING HOUSE, DETACHED CERAMIC ART STUDIO WITH ANCILLARY STORAGE SPACE, SEPTIC TANK/ SEWAGE TREATMENT SYSTEM AND ASSOCIATED SITE DEVELOPMENT... login required. |
Details... |
830m |
09/05/2023 |
CONDITIONAL |
ARDNAGAPPERY , DERRYBEG , LETTERKENNY PO |
ENTRANCE PORCH AND REAR CONSERVATORY TO DWELLING HOUSE... login required. |
Details... |
1.9km |
17/04/2023 |
CONDITIONAL |
CARRICK (CARRICK BOYLE) , DERRYBEG , LETTERKENNY PO |
(1) CONSTRUCTION OF A FIRST FLOOR EXTENSION, (2) ALTERATIONS TO FENESTRATIONS, (3) CHANGE OF USE OF EXISTING STORE ROOM INTO WET-ROOM AND ENSUITE ROOM, (4) REPLACEMENT ROOF TO EXISTING STORE ROOM AND (5) ALL ASSOCIATED SITE DEVELOPMENT WORKS... login required. |
Details... |