Bailieborough Wastewater Treatment Plant , Shercock Road Beckscourt Bailieborough , Co. Cavan

Jun 13 2025

Application Received
  • Submitted: 13 / 06 / 2025
  • Application Type:
    PERMISSION
  • Application Status:
    INCOMPLETED APPLICATION
  • Council Decision:
    N/A (Unknown)

Useful Links:

Development Description:

for (i) Demolition and replacement of existing Inlet works; (ii) SWO outfall from existing Storm Water Tank to be decommissioned; (iii) Proposed Dual Function Overflow outfall pipe connection from the WwTP inlet works to an existing drainage culvert pipeline; (iv) Provision of 1 no. new Storm Water Storage Holding Tank and associated SWO outfall pipe connection to the existing drainage culvert pipeline; (v) Provision of 1 no. aeration tank and 2 no. settlement tanks; (vi) Demolition of the existing oxidation ditch and clarifiers; (vii) Provision of below and above ground chambers (pump chambers and process drainage); (viii) Provision of service water pump sump (wash water recycle system to clean equipment); (ix) Provision of new WwTP Primary Discharge outfall pipe connection to the existing drainage culvert pipeline; (x) Provision of 1 no. picket fence thickener and mechanical dewatering unit; (xi) Provision of chemical storage and dosing equipment for alkalinity boosting, phosphorus removal and sludge treatment; (xii) Provision of 1 no. building (Sludge dewatering building) of operating equipment and 2 no. of kiosks (Intake MCC Kiosk and Aeration Tanks MCC Kiosk); (xiii) Provision of odour control unit and associated above ground ductwork; (xiv) Provision of a back-up generator with diesel tank to be used in an emergency/power cut; (xv) Provision of an ESB substation; (xvi) Demolition of the existing tanks not used in the future design (i.e., inlet works, storm tank, oxidation ditch, circular clarifier and drainage/process pump sumps, polymer preparation building, sludge blanket thickener, sludge holding tank, scum chamber and sludge dewatering kiosk); (xvii) Extension of internal access road and provision of turning head to the northern end of the site; (xviii). Ancillary and associated development including: a) Equipment lifting gantries, access platforms; b) Provision of paved/pebble area within the site; c) Landscaping works d) Replacement of site fence; e) Mechanical and electrical service connections f) Landscaping works; (xix) Installation of south facing Solar PV Panels; (xx) Retaining wall to the northern part of the site and entrance of the site. A Natura Impact Statement will be submitted to the planning authority with the application

Nearby Applications:

Appeals / Commencement

No Appeals Found

Decision Appealed:

  • Appeal Submitted: 01 / 01 / 1990
  • Appeal Status:
  • Appeal Decision:
  • An Coimisiún Pleanála File Ref.:
  • Note: If an appeal has been lodged and information isn't showing then this means An Coimisiún Pleanála hasn't published the data for reuse by PlanningAlerts.ie. You will need to follow up directly on the ACP website. Use the reference number, above, if available.

No Commencement Found

Commencement Information:

Copyright:

Creative Commons LicensePlanning Data is published by Department of Housing, Planning and Local Government and is licensed under a Creative Commons Attribution-NoDerivatives 4.0 International License.