Lands at Lisdaran Townland , Loreto Road , Cavan Town
Jan 16 2026
Further Info. Requested-
Submitted: 13 / 11 / 2025
-
Application Type:
PERMISSION -
Application Status:
FURTHER INFORMATION -
Council Decision:
N/A (Unknown)
Useful Links:
Development Description:
for Large Scale Residential Development consististing of the provision of a total of 109no. residential units along with provision of a crèche. Particulars of the development comprise as follows:
(a) Site excavation works to facilitate the proposed development to include excavation and general site preparation works. (b) The provision of a total of 65no. residential dwellings which will consist of 23no. 2 bed units, 26no. 3 bed units and 16no. 4 bed units. (c) The provision of a total of 44no. duplex apartment units consisting of 8no.1 bed units, 18no. 2bed units and 18no. 3 bed units. The duplex apartment units range in height from two storey to three storey. (d) Provision of a two storey creche with associated parking, bicycle and bin storage. (e) Provision of associated car parking at surface level via a combination of in-curtilage parking for dwellings and via on-street parking for the creche and duplex apartment units. (f) Provision of electric vehicle charge points with associated site infrastructure ducting to provide charge points for residents throughout the site. (g) Provision of associated bicycle, bin and bulky items storage facilities for duplex apartment units. (h) Upgrading the existing access point from Loreto Road with associated works to include for provision of a right turning lane, provide for internal access roads, footpaths and associated site works. (i) Provision of internal access roads and footpaths and associated works to include for regrading of site levels as required along with connections onto the Greenway. (j) Provision of residential communal open space and public open space areas to include formal play areas along with all hard and soft landscape works with public lighting, planting and boundary treatments to include boundary walls, railings & fencing. (k) Internal site works and attenuation systems which will include for provision of hydrocarbon and silt interceptors prior to discharge. (l) All ancillary site development/construction works to facilitate foul, water and service networks for connection to the existing foul sewer, water connections and ESB network connections along with provision of an ESB substation. A Natura Impact Statement (NIS) has been prepared in respect of the proposed development and accompanies this application
Nearby Applications:
Appeals / Commencement
No Appeals Found
Decision Appealed:
- Appeal Submitted: 01 / 01 / 1990
- Appeal Status:
- Appeal Decision:
- An Coimisiún Pleanála File Ref.:
- Note: If an appeal has been lodged and information isn't showing then this means An Coimisiún Pleanála hasn't published the data for reuse by PlanningAlerts.ie. You will need to follow up directly on the ACP website. Use the reference number, above, if available.
No Commencement Found
Commencement Information:
- Notice Submitted:
- Start Date:
- BCMS Notice:
- View on BCMS Website
Copyright:
Planning Data is published by Department of Housing, Planning and Local Government and is licensed under a Creative Commons Attribution-NoDerivatives 4.0 International License.