Pollymount Bellanamullia Scramoge , Treanaceeve and Ballyhubert , County Roscommon.

Sep 15 2025

Application Received

Dec 23 2025

Further Info. Requested

Jun 26 2026

Further Info. Received

Aug 20 2026

Decision

Aug 20 2026

Decision Due

Sep 02 2026

Appeal Submitted
  • Submitted: 15 / 09 / 2025
  • Application Type:
    PERMISSION
  • Application Status:
    APPEALED
  • Council Decision:
    CONDITIONAL (Granted)

Useful Links:

Development Description:

Permission for development consisting of: • The construction and operation of a wind farm consisting of six wind turbines; • The turbine specification is unconfirmed but will fall within the parameter range outlined by Roscommon County Council and will be one of the following three Options; - Technology Option 1: tip height of 160m, rotor diameter of 136m and hub height of 92m; or - Technology Option 2: tip height of 156m, rotor diameter of 133m and hub height of 90m; or - Technology Option 3: tip height of 159m, rotor diameter of 138m and hub height of 90m; • Construction of turbine hardstands (including crane and assembly areas) and turbine foundations; • Construction of approximately 3.9km of new permanent internal site access tracks and the upgrade of 0.5km of existing internal site access tracks; • Construction of a permanent onsite 38kV electrical substation, including one single storey substation building with welfare facilities, Lidar, diesel generator and fuel storage tank, all associated electrical plant and equipment, all associated underground cabling, rainwater harvesting and storage tank, wastewater holding tank, security fencing, gates, signage, and all ancillary structures and works; • Installation of underground electrical and communications cabling connecting the wind turbines to the proposed onsite 38kV electrical substation; • Construction of two temporary site compounds with associated site offices, welfare facilities, car parking, site fencing and lighting; • Erection of a permanent 30m high communications relay tower; • Construction access via six site entrances (SE1 – SE6) to include: - SE1 on the R371, SE2 and SE3 on the L6018, and SE4, SE5 and SE6 on the L60498; - SE1 and SE6 are temporary and will be reinstated following construction. SE1 may be re-established if required for turbine component repair or replacement. SE2 – SE5 will be retained permanently for operational access; • Tree felling to facilitate the construction and operation of the proposed development; • Installation of approximately 5.1km of permanent underground electrical cabling for the grid connection including cabling within the public road corridor, extending from the proposed onsite 38kV electrical Substation at Ballyfeeny to end at the junction of the R371 and the Sliabh Bawn Substation Road in the townland of Tooreen; • All associated site works, including site clearance, landscaping, site drainage, s

Nearby Applications:

Appeals / Commencement

No Appeals Found

Decision Appealed:

  • Appeal Submitted:
  • Appeal Status:
  • Appeal Decision:
  • An Coimisiún Pleanála File Ref.: PL-502020-RN-26
  • Note: If an appeal has been lodged and information isn't showing then this means An Coimisiún Pleanála hasn't published the data for reuse by PlanningAlerts.ie. You will need to follow up directly on the ACP website. Use the reference number, above, if available.

No Commencement Found

Commencement Information:

Copyright:

Creative Commons LicensePlanning Data is published by Department of Housing, Planning and Local Government and is licensed under a Creative Commons Attribution-NoDerivatives 4.0 International License.