Ballincar , Sligo , Co. Sligo
Jun 24 2026
DecisionJun 30 2026
Decision Due-
Submitted: 06 / 05 / 2026
-
Application Type:
RETENTION -
Application Status:
DECISION MADE -
Council Decision:
CONDITIONAL (Granted)
Useful Links:
Development Description:
Retention of the following: Construction of 2nr additional dormer windows on the rear (northern elevation). Omission of 1nr original dormer window and replacement with a roof window in-lieu on the rear (northern elevation). Alterations to fenestrations on sides and rear elevations as constructed, Alteration to front porch roof from hip to ‘A’ roof design. Alteration of hip on rear roof to ‘A’ roof design. Addition of 2nr roof windows on the eastern & western roof planes of rear roof structure serving stairwell / landing area. Extension to the rear of the existing kitchen which includes a new link corridor to existing hallway and the erection of a new rear porch entrance at the basement level (northern elevation) & Planning Permission for the following:To construct of a new on-site PET system with percolation area to replace the existing FW discharge system. Reconnection to existing site services & All associated site development works deemed necessary
Nearby Applications:
Appeals / Commencement
No Appeals Found
Decision Appealed:
- Appeal Submitted:
- Appeal Status:
- Appeal Decision:
- An Coimisiún Pleanála File Ref.:
- Note: If an appeal has been lodged and information isn't showing then this means An Coimisiún Pleanála hasn't published the data for reuse by PlanningAlerts.ie. You will need to follow up directly on the ACP website. Use the reference number, above, if available.
No Commencement Found
Commencement Information:
- Notice Submitted:
- Start Date:
- BCMS Notice:
- View on BCMS Website
Copyright:
Planning Data is published by Department of Housing, Planning and Local Government and is licensed under a Creative Commons Attribution-NoDerivatives 4.0 International License.