2.1km |
12/03/2024 |
CONDITIONAL |
Drum House , Drumederalena Ballygawley , Collooney |
Construction of a single storey domestic garage and all associated site works... login required. |
Details... |
2.1km |
26/02/2024 |
N/A |
Drum House , Drumederalena Ballygawley , Collooney |
Construction of a single storey garage and all associated site works... login required. |
Details... |
2.9km |
19/01/2024 |
CONDITIONAL |
Markree Castle , Collooney , Co Sligo |
Retain existing storage shed and install biomass fueled heating system consisting of, 6 metre diameter woodchip storage tank, new boiler and water storage tank to be located in exist... login required. |
Details... |
1.3km |
11/10/2023 |
CONDITIONAL |
Rosewood Cottage , Tullybeg , Ballygawley County Sligo |
the construction of a new wastewater treatment system and associated percolation area and all ancillary site works... login required. |
Details... |
1.9km |
07/09/2023 |
CONDITIONAL |
Sooey Td. , Sooey , County Sligo |
(a) retain the location of dwelling house, domestic garage and driveway on an enlarged site which differs from previous grant of planning permission ref. PL 03/618, (b) retain c... login required. |
Details... |
2.4km |
15/08/2023 |
CONDITIONAL |
Ballygrania , Collooney , Co. Sligo |
construction of a new dwelling house, domestic garage, sewage treatment system, percolation area and all associated site works and services ... login required. |
Details... |
2.1km |
14/04/2023 |
CONDITIONAL |
Drum Lodge , Drumederalena Ballygawley , Collooney |
alterations to the existing dwelling including new windows, cladding, removal of chimney stacks and all associated site works... login required. |
Details... |
2.1km |
14/04/2023 |
CONDITIONAL |
Drum House , Drumederalena Ballygawley , Collooney |
Demolition of existing garage/store, Construction of a single storey extension to the side of the existing dwelling, alterations to existing porch and all associated site works... login required. |
Details... |
2.5km |
09/11/2022 |
N/A |
Townland of Ballysumaghan , Fannybrook , Quarry Lane |
development consisting of the development of a battery energy storage system. The development will consist of a 10 year planning permission for the construction of a: (1) enclosed battery energy storage system compound on a total of up to c. 1.7 hectare site, to include: 1 no. single storey customer substation and 1 no. TSO substation (c. 182m2), control and switch rooms, up to 174 battery units set inside storage blocks on concrete support structures including heating, ventilation and air conditioning unit (HVAC units), transfo... login required. |
Details... |
2.5km |
27/10/2022 |
CONDITIONAL |
Ballysumaghan , Sooey , County Sligo |
development consisting of (a) A High Inertia Synchronous Compensator (HISC) compound containing 1 No. HISC unit enclosed within a steel clad framed style structure (12.1m max height) and supported by 7 No. electrical equipment containers (containing ancillary power supply products including static frequency converters, MV switchgear, exciters, LV distribution, control room); 4 No. external cooler units; main, auxiliary & start-up electrical transformers, generator circuit breakers, switchgear equipment, and 1 No. back up diesel generator and associated diesel storage tank; (b) A 220kV High Voltage Gas Insulated Switchgear (GIS) compound containing a GIS building with all control & HV equipment within a single storey building (13.2m max height). The building will be surrounded by a compound road and contained within a 2.6 high g... login required. |
Details... |
2.1km |
26/10/2022 |
CONDITIONAL |
Ballysumaghan , Co. Sligo |
development consisting of: The 10 year permission for the construction and operation of a synchronous condenser facility. The facility will be a fenced compound ca. 1.196ha in size. The development will have a 30 year operational lifetime and will consist of a synchronous condenser, which will include the following elements: generator and flywheel building (ca. 600 sq.m., ca. 12.5m high) to house the equipment including the generator, flywheel, lube oil skid, vacumn skid, TEWAC pump skid, reverse switch cubicle and star point cubicle; SFC start-up equipment room (ca. 43.650 sq.m., ca. 4.20m high); AC/DC room (ca. 81.480 sq.m., ca. 4.20m high); C&P room (ca. 70.685 sq.m., ca. 4.20m high); battery room (ca. 28.130 sq.m., ca. 4.20m high); storage room (ca. 49.200 sq.m., ca. 4.20m high); supporting components of plant within the compound th... login required. |
Details... |
1.4km |
29/07/2022 |
CONDITIONAL |
Kilross , Ballygawley , Co. Sligo |
development consisting of the following: provision of an alternative entrance to serve existing dwelling house, new parking area, all ancillary site works including landscaping and closure of existing entrance... login required. |
Details... |
2.7km |
11/07/2022 |
N/A |
Knockrawer , Collooney , Co. Sligo |
development consisting of the following: to construct a storey and a half extension to the side and rear of the existing dwelling. Construct and install a new PET system with associ... login required. |
Details... |
2.7km |
22/03/2022 |
CONDITIONAL |
Ballygrania , Collooney , Co. Sligo |
development consisting of the following: to retain renovations and extensions to dwelling house as constructed and for permission to renovate and construct first floor extensions to detached dwelling house... login required. |
Details... |
1.6km |
25/02/2022 |
N/A |
Tully Beg , Ballygawley , Co Sligo |
Development consisting of the following: 1. Demolition of the existing domestic dwelling, 2. Construction of a new domestic dwelling and domestic garage. 3. Upgrading the existing domestic waste water treatment system to EPA code of practice standards together with all associated ancillary works... login required. |
Details... |
2.7km |
30/09/2021 |
CONDITIONAL |
Carrownagh Td , Ballygawley , Co. Sligo |
Development consisting of decommissioning of existing percolation area serving existing dwelling house and construction of polishing filter to include packaged tertiary unit and all other associated site works... login required. |
Details... |
2.4km |
16/09/2021 |
CONDITIONAL |
Ballysumaghan , Ballintogher , Co Sligo |
Development consisting of upgrading treatment system at existing house by installing new waste water treatment system and Ter 3 Packaged Tertiary unit
... login required. |
Details... |
2.7km |
12/07/2021 |
REFUSED |
Knockrawer , Collooney , Co Sligo |
Development consisting of construction of a two storey dwelling house, on-site PET system with tertiary treatment modules and carrying out of all associated site development works deemed necessary
... login required. |
Details... |
2.7km |
26/05/2021 |
CONDITIONAL |
Killeenduff , Ballintogher , Co Sligo |
Development consisting of construction of new agricultural access entrance to farm lands together with all ancillary site works and services
... login required. |
Details... |