1.5km |
29/04/2024 |
n/a |
Centra Main Street Enniscrone, Co. Sligo F26Y6ND |
The development will consist of placement a pay to use portable waste compactor for residual waste and food waste and a pay to use portable waste compactor for mixed dry recyclables. This activity requires the developers to process a waste certificate of registration.... login required. |
Details... |
980m |
29/03/2024 |
n/a |
Rose Cottage, Main Street, Enniscrone, Co. Sligo |
restoration of existing dwelling and new build of a single storey extension to the front of the dwelling and a two storey extension to the north gable of dwelling.The height of the two storey building is 7.37mts please refer to drawings for further information... login required. |
Details... |
1.7km |
26/03/2024 |
n/a |
Main Street, Enniscrone, Co Sligo |
for part change of use of existing ground floor family entertainment centre to Gourmet food takeaway (105.53 SQ. M), together with all associated site works.... login required. |
Details... |
1.1km |
21/03/2024 |
N/A |
The Old Granary. , Trotts Main Street , Enniscrone |
CONSTRUCTION OF EXTENSIONS AND ALTERATIONS TO FORMER ONE STOREY DWELLING TO PROVIDE A NEW TWO STOREY DWELLING AND EXTENSIONS AND ALTERATIONS OF EXISTING ANCILLARY BUILDINGS, DEMOLITION OF ONE LARGE BARREL ROOF FARMING SHED REPLACING IT WITH A... login required. |
Details... |
1.5km |
01/03/2024 |
N/A |
Carrowhubbuck South Inishcrone Co. Sligo , |
consist of 13 no. dwelling houses. Consisting of (a) 2 no. terrace blocks providing for 6 no. 3 bedroom units & 1 no. 1 bedroom unit. (b) 3 no. semi-detached ... login required. |
Details... |
2.4km |
12/02/2024 |
CONDITIONAL |
Carrowcoller , Kilglass , Enniscrone Co. Sligo |
Planning permission to construct a domestic garage and to carry out all associated ancillary site works at Carrowcoller, Kilglass, Co. Sligo.... login required. |
Details... |
920m |
20/12/2023 |
CONDITIONAL |
Rath Ghlas , Trotts , Enniscrone |
alterations to approved house design previously granted under P22/366 for house No's. 4, 6 & 7... login required. |
Details... |
2.9km |
19/12/2023 |
N/A |
Carrownurlar Td. , Enniscrone , Co. Sligo. |
the construction of a new detached dwelling house, together with effluent treatment system, percolation area and all associated site works... login required. |
Details... |
1.7km |
06/12/2023 |
CONDITIONAL |
Cliff Road , Carrowhubbuck South , Enniscrone |
The development will consist of the following; (a) to retain the demolition of derelict dwelling house and (b) to construct a dwelling house, connect to public utilities together with ancillary site development works... login required. |
Details... |
1.7km |
06/12/2023 |
CONDITIONAL |
Cliff Road , Carrowhubbuck South , Enniscrone |
The development will consist of the following; (a) to retain demolition of existing derelict buildings and (b) to construct 3 nr. dwelling houses, connect to public utilities together with ancillary site development works... login required. |
Details... |
1.4km |
08/11/2023 |
N/A |
Benbulben Hotel , Main Street , Enniscronne Co.Sligo |
development consisting of; the reinstatement of restaurant and tourism accommodation to the site. This application can be understood as two building forms: the original 2 storey pitched roof house form that faces the main street (block A) and the linear accommodation block that runs North-South (block B). Existing Block A, will have a cafe at ground floor with street furniture, and a two bedroom apartment to the first floor. Demolition, alteration and extension to block B to form a three story flat roof building containing 10no. two b... login required. |
Details... |
1.7km |
26/10/2023 |
CONDITIONAL |
Meadowside House , Kilglass , Co Sligo |
Planning permission for removal of part of the existing front boundary wall, and to reconstruct this wall in a new location set back from the road edge, together with the carrying out of all associated ancillary ... login required. |
Details... |
1.8km |
23/10/2023 |
CONDITIONAL |
Kilglass , Enniscrone , Co Sligo |
the construction of new dwelling house, on-site wastewater treatment system, new site entrance, set-back and reconstruction of existing roadside stone wall together with ancillary site development works.... login required. |
Details... |
1.7km |
19/10/2023 |
N/A |
Cliff Road , Carrowhubbuck South , Enniscrone |
The development will consist of the demolition of existing derelict buildings and construction of 3 nr. dwelling houses, connection to public utilities together with ancillary site development works.... login required. |
Details... |
1.7km |
12/10/2023 |
N/A |
Cliff Road , Carrowhubbuck South , Enniscrone |
The development will consist of the demolition of existing derelict buildings and construction of 3 nr. dwelling houses, connection to public utilities together with ancillary site development works.... login required. |
Details... |
1.7km |
12/10/2023 |
N/A |
Cliff Road , Carrowhubbuck South , Enniscrone |
The development will consist of the demolition of existing derelict dwelling and construction of a dwelling house, connection to public utilities together with ancillary site development works.... login required. |
Details... |
1.7km |
02/10/2023 |
N/A |
Cliff Road , Carrowhubbuck South , Enniscrone |
The development will consist of the construction of a dwelling house, connection to public utilities together with ancillary site development works.... login required. |
Details... |
1.8km |
02/10/2023 |
CONDITIONAL |
Enniscrone Cliff Walk/Promenade environs , located between the Cliff Road The Hollows Carpark Enniscrone Beach the Cliff Bath House and old Slipway , Enniscrone Co. Sligo |
demolition of Existing Pavilion above the Hollows Car Park; the existing external stairways, ramps and walkways between the existing Pavilion and the Cliff Bath House along with general associated external works; the removal of a section of wall along the Cliff Road to facilitate the construction of a new widened Boardwalk on the Cliff Road leading to a new Viewing Area with a new Covered Colonnade below and a new Accessible Ramp leading down from the street to the Upper Promenade; the construction of a new Accessible ramp leading from the Upper Promenade to the proposed new Community Pavilion; the construction of a new Diagonal ramp leading from the Upper Promenade to the Lower Promenade to include the removal of a section of the Lower Promenade retaining wall; the installation of 5 no. Covered Shelters along the Lower Promenade and the existing Stepped Ramp at the northern end; the installation of a new Accessible Walkway from the north end of the Lower Promenade adjacent to the Cliff Bank behind the Clift Bath House leading to the Old Slipway with a link to the Cliff Bath House; a new retaining wall with replacement steps leading back up the grassy area at the Cliff Road; the construction of New Accessible Toilets behind the ex... login required. |
Details... |
1.7km |
02/10/2023 |
N/A |
Cliff Road , Carrowhubbuck South , Enniscrone |
The development will consist of the construction of 3 nr. dwelling houses, connection to public utilities together with ancillary site development works.... login required. |
Details... |
2.3km |
05/09/2023 |
CONDITIONAL |
Lackan , Enniscrone , Co. Sligo |
development consisting of the following: to construct dwelling house, construct domestic garage, install effluent treatment system with percolation area and to carry out all associated ancillary site works ... login required. |
Details... |