Submitted: 28 / 02 / 2025
-
Application Type:
PERMISSION -
Application Status:
APPLICATION FINALISED -
Council Decision:
CONDITIONAL (Granted)
Useful Links:
Development Description:
The development will consist of the following elements:
• Battery Energy Storage System facility, consisting of battery containers with integrated HVAC (Heating, Ventilation, Air Conditioning) units, transformers,
inverters, underground cabling, associated control rooms, internal access routes, lighting, CCTV, lightning masts, fencing;
• Associated Electrical Compound consisting of: Low voltage operations compound including one (1) single storey control and operational building, electrical plant,
cabling, lighting, CCTV, lightning masts, diesel generator and diesel tank, operations and maintenance containers and stores;
• High voltage electrical yard comprising outdoor electrical plant and associated compound;
• Underground high voltage electrical cable to facilitate a connection to the existing adjacent 110kV Tawnaghmore substation;
• Associated landscaping, drainage, decommissioning of existing septic tank and all ancillary works necessary to facilitate the development
A 10-year permission is sought in respect of the development.
Certain details of the proposed development are unconfirmed in the planning application, and an opinion on unconfirmed details accompanies the application.
The Tawnaghmore Power Station has an Environmental Protection Agency (EPA) issued Industrial Emissions (IE) Licence (Reg, No. P0566-02).
Nearby Applications:
Appeals / Commencement
No Appeals Found
Decision Appealed:
- Appeal Submitted:
- Appeal Status:
- Appeal Decision:
- An Coimisiún Pleanála File Ref.:
- Note: If an appeal has been lodged and information isn't showing then this means An Coimisiún Pleanála hasn't published the data for reuse by PlanningAlerts.ie. You will need to follow up directly on the ACP website. Use the reference number, above, if available.
No Commencement Found
Commencement Information:
- Notice Submitted:
- Start Date:
- BCMS Notice:
- View on BCMS Website