at Chapelizod Road (R109), Chapelizod, Dublin 8, and Irish National War Memorial Gardens (INWMG)

Feb 26 2024

Application Received

Apr 17 2024

Further Info. Requested

Sep 16 2024

Further Info. Received

Oct 10 2024

Decision

Oct 11 2024

Decision Due

Dec 03 2024

Granted
  • Submitted: 26 / 02 / 2024
  • Application Type:
    Permission
  • Application Status:
    Decision Notice Issued
  • Council Decision:
    GRANT PERMISSION (Granted)

Useful Links:

Development Description:

PROTECTED STRUCTURE We, the Commissioners of Public Works, are applying for Planning Permission to the above named authority to construct a new accessible commemorative pedestrian and cycle bridge across the River Liffey which will also provide a new ceremonial entrance to the Irish National War Memorial Gardens (INWMG) at Chapelizod Road (R 109), Chapelizod, Dublin 8, Dublin. Under the Dublin City Development Plan 2022 - 2028, this site is included on the Record of Protected Structures, Ref. No. 2028 (Con Colbert Road, Dublin 8. Memorial Park, Islandbridge). The works will comprise of a lightweight arched stainless steel bridge to cross over the River Liffey with an uninterrupted span of 58 metres and a structural depth of approximately 0.35 metres. Works on both sides of the proposed stainless steel bridge to include: - a new ceremonial entrance plaza with stainless steel gates, granite wall and granite paved set-down area, with - a new permeable asphalt path connected to the bridge (northern end) and also running from the bridge (southern end) land on axis with the Temple (built 1993) in the INWMG. Areas of granite paving will drain to open jointed soak-away channels. The permeable asphalt paths do not require any additional drainage. All rainwater run-off will be retained on site to percolate into the ground. Enabling works and all ancillary site services be carried out as part of this proposed development. Removal of 7 trees on the north side of the river to allow for a safe wayfinding to the bridge. Proposed wildflowers planting to the northern side and mown grass to the southern side to match the rest of the INWMG. A Natura Impact Statement has been prepared in respect of this planning application. This application relates to Objective SMTO27 on the land Development Plan 2022 - 2028 Sustainable Movement and Transport.

Nearby Applications:

Appeals / Commencement

No Appeals Found

Decision Appealed:

  • Appeal Submitted:
  • Appeal Status:
  • Appeal Decision:
  • An Coimisiún Pleanála File Ref.:
  • Note: If an appeal has been lodged and information isn't showing then this means An Coimisiún Pleanála hasn't published the data for reuse by PlanningAlerts.ie. You will need to follow up directly on the ACP website. Use the reference number, above, if available.

No Commencement Found

Commencement Information:

Copyright:

Creative Commons LicensePlanning Data is published by Department of Housing, Planning and Local Government and is licensed under a Creative Commons Attribution-NoDerivatives 4.0 International License.