Skip to main content
Our Subscriber Plan is now 50% off Discount expires on Saturday, 01 August 2026. Get in touch about our Business Accounts and generate a free test alert.

Lands at Stonehaven Phase 3 , Tipper West Blessington Road , Naas

Nov 21 2025

Application Received

Jan 22 2026

Further Info. Requested

May 27 2026

Further Info. Received

Jun 22 2026

Decision

Jun 23 2026

Decision Due

Jul 07 2026

Commencement Notice

Jul 21 2026

Commencement Started
  • Submitted: 21 / 11 / 2025
  • Application Type:
    PERMISSION
  • Application Status:
    DECISION MADE
  • Council Decision:
    CONDITIONAL (Granted)

Useful Links:

Development Description:

for development and amendments relating to a previously permitted housing development under An Coimisiún Pleanála (ACP) Ref. PL09.247411 (KCC Ref. 15/1060), which was extended under KCC Ref. 21/777 and amended under KCC Ref. 24/61085 on a site (c. 2.05 hectares) on lands at Stonehaven, Phase 3, Tipper West, Blessington Road, Naas, County Kildare. The proposed development and amendments will consist of the following: (i) Replacement of 47 no. previously permitted houses (20 no. 4-bed houses [Type A1], 24 no. 3-bed houses [Types A2, A3, H, and J], and 3 no. 5-bed houses [Type E1], ranging from two to three storeys) with 46 no. houses (19 no. 3-bed houses [Types L1 and L2] and 27 no. 4-bed houses [Types M2, M3, R, and R1], ranging from two to three storeys in height); (ii) Development of 8 no. 3-storey duplex buildings, comprising a total of 16 no. units. Each duplex building contains a ground-floor apartment (Types P1 and S1) and an upper-level duplex unit (Types P3 and S2), each with separate entrances; (iii) Provision of ancillary in-curtilage and visitor car parking, bicycle parking and storage, bin storage, and private open space (gardens or terraces) for all units; (iv) Modifications to the site layout and associated infrastructure, including revisions to internal road layout, parking, drainage, boundary treatments, public lighting, landscaping, and open spaces, along with all necessary site works and infrastructure connections to support the development; (v) Provision of water services connections linking Phase 3 to the existing permitted infrastructure in Stonehaven Phase 2 (KCC Ref. 24/61085); and, (vi) Amending Condition 3 of ACP Ref. PL09.247411 (KCC Ref. 15/1060) to permit 15 no. additional residential units

Nearby Applications:

Appeals / Commencement

No Appeals Found

Decision Appealed:

  • Appeal Submitted:
  • Appeal Status:
  • Appeal Decision:
  • An Coimisiún Pleanála File Ref.:
  • Note: If an appeal has been lodged and information isn't showing then this means An Coimisiún Pleanála hasn't published the data for reuse by PlanningAlerts.ie. You will need to follow up directly on the ACP website. Use the reference number, above, if available.

No Commencement Found

Commencement Information:

  • Notice Submitted: 07 / 07 / 2026
  • Start Date: 21 / 07 / 2026
  • BCMS Notice: Subscriber Access Required
  • View on BCMS Website

Copyright:

Creative Commons LicensePlanning Data is published by Department of Housing, Planning and Local Government and is licensed under a Creative Commons Attribution-NoDerivatives 4.0 International License.