Stonyford Bridge , Cloncarneel , Ballvor

Jun 24 2026

Application Received

Aug 18 2026

Decision Due
  • Submitted: 24 / 06 / 2026
  • Application Type:
    PERMISSION
  • Application Status:
    NEW APPLICATION
  • Council Decision:
    N/A (Unknown)

Useful Links:

Development Description:

modifications to a previously approved development (MCC Ref. No. 24/60622). The proposed modifications to the approved development are: 1) relocation of the high-lift network pumping station kiosk from adjacent and south of the treated water storage tank to adjacent and west of the storage tank; 2) the external dimensions of the enclosure to the pumping station kiosk are (h)3.2m x (w)6.5m x (d)3.75m, where previously it was (h)3.2m x (w)4.0m x (d)3.3m; and the ridge height of the roof of the kiosk enclosure is unchanged at 63.070m AOD; and 3) relocation of the reservoir roof access staircase from the southeastern end to the southwestern end of the treated water storage tank. A Natura Impact Statement has been prepared and will be submitted with the planning application

Nearby Applications:

Appeals / Commencement

No Appeals Found

Decision Appealed:

  • Appeal Submitted:
  • Appeal Status:
  • Appeal Decision:
  • An Coimisiún Pleanála File Ref.:
  • Note: If an appeal has been lodged and information isn't showing then this means An Coimisiún Pleanála hasn't published the data for reuse by PlanningAlerts.ie. You will need to follow up directly on the ACP website. Use the reference number, above, if available.

No Commencement Found

Commencement Information:

Copyright: