Site 5a / 5b , National Business Park , Togher Portlaoise Co. Laois
-
Submitted: 03 / 04 / 2026
-
Application Type:
PERMISSION -
Application Status:
INCOMPLETED APPLICATION -
Council Decision:
N/A (Unknown)
Useful Links:
Development Description:
construct an insulated construction systems manufacturing unit with associated office accommodation with separate storage unit with stock yard • Overall combined floor area is c. 6’344 sq.m. See following breakdown: • manufacturing unit is c. 4,588 sq.m • office space is c. 730 sq.m, • The height of the manufacturing building is 10.5 meters to its parapet. • Storage Unit of c.1026 sq.m with an overall height to parapet of 7 meters. • 2 access are proposed , one from the east (from existing roundabout spur), and the second from the South (new entrance). • Provision of no. 50 car parking spaces (comprising 3 no. accessible spaces, and 5 no. EV spaces), and 50 bicycle spaces to serve the proposed development. • All ancillary works including landscaping, boundary treatments, internal roadways, car parking, Stock yard and associated infrastructure both above and below ground level
Nearby Applications:
Appeals / Commencement
No Appeals Found
Decision Appealed:
- Appeal Submitted:
- Appeal Status:
- Appeal Decision:
- An Coimisiún Pleanála File Ref.:
- Note: If an appeal has been lodged and information isn't showing then this means An Coimisiún Pleanála hasn't published the data for reuse by PlanningAlerts.ie. You will need to follow up directly on the ACP website. Use the reference number, above, if available.
No Commencement Found
Commencement Information:
- Notice Submitted:
- Start Date:
- BCMS Notice:
- View on BCMS Website
Copyright:
Planning Data is published by Department of Housing, Planning and Local Government and is licensed under a Creative Commons Attribution-NoDerivatives 4.0 International License.