Townlands of Acragar Ballyconra Ballycuddihy Ballyroe Ballyroe (Grace) Ballyroe (Maher) Baunaniska Boherkyle Briskalagh Brittas Clone Coolnapisha Curraghduff , Freshford Freshford Lots Graigueswood Grange Huntstown Kilmanagh Knockeenglass Knockown Mo
Dec 13 2024
WithdrawnJan 18 2025
Decision Due-
Submitted: 15 / 11 / 2024
-
Application Type:
PERMISSION -
Application Status:
WITHDRAWN -
Council Decision:
N/A (Unknown)
Useful Links:
Development Description:
permission for a period of 10 years for a development at this site situated in the townlands of Acragar, Ballyconra, Ballycuddihy, Ballyroe, Ballyroe (Grace), Ballyroe (Maher), Baunaniska, Boherkyle, Briskalagh, Brittas, Clone, Coolnapisha, Curraghduff, Freshford, Freshford Lots, Graigueswood, Grange, Huntstown, Kilmanagh, Knockeenglass, Knockown, Moatpark, Monabrika, Monavadaroe, Moneenaun, Oldtown, Oldtownhill, Parksgrove, Picketstown, Rathealy, Sart, Sweethill, Tobernapeastia, Tullaroan, Upperwood Demesne, Co. Kilkenny.
The development will consist of the provision of the following:
i. 7 no. wind turbines with an overall turbine tip height of 185 metres; a rotor blade diameter of 163 metres; and hub height of 103.5 metres, and associated foundations and hard-standing areas;
ii. A permanent 38kV substation compound (control building with welfare facilities, all associated electrical plant and apparatus, security fencing, underground cabling, storage containers, wastewater holding tank, site drainage and all ancillary works);
iii. Permanent underground electrical (38kV) and communications cabling to the existing Ballyragget 110kV substation in the townland of Moatpark (including joint bays, communication and earth sheath link chambers and all ancillary works along the route). This cabling route is primarily located within the public road corridor which includes a Protected Structure (Kilkenny RPS Ref. C886);
iv. Underground electrical (33kV) and communications cabling connecting the wind turbines and meteorological mast to the on-site substation;
v. 3 no. temporary construction compounds (including site offices and welfare facilities);
vi. A meteorological mast with a height of 30 metres, security fencing and associated foundation and hard-standing area;
vii. A new temporary site entrance on the L1009;
viii. A new gated site entrance on the L5024;
ix. Upgrade of existing site tracks/ roads and provision of new site access roads, junctions and hardstand areas;
x. A borrow pit;
xi. Spoil Management;
xii. Tree felling and hedgerow removal;
xiii. Biodiversity Management and Enhancement Plan measures (including establishment of a riparian buffer and hedgerow enhancement);
xiv. Site Drainage;
xv. Operational Stage site signage; and
xvi. All ancillary works and apparatus.
A thirty five-year operational life from the date of full commissioning of the wind turbines and subsequent decommissioning of the wind turbines is being soug
Nearby Applications:
Appeals / Commencement
No Appeals Found
Decision Appealed:
- Appeal Submitted:
- Appeal Status:
- Appeal Decision:
- An Coimisiún Pleanála File Ref.:
- Note: If an appeal has been lodged and information isn't showing then this means An Coimisiún Pleanála hasn't published the data for reuse by PlanningAlerts.ie. You will need to follow up directly on the ACP website. Use the reference number, above, if available.
No Commencement Found
Commencement Information:
- Notice Submitted:
- Start Date:
- BCMS Notice:
- View on BCMS Website
Copyright: