Ballytobin & Ballyhall , Co. Kilkenny
Jun 25 2026
Decision Due-
Submitted: 01 / 05 / 2026
-
Application Type:
PERMISSION -
Application Status:
PRE_VALIDATION -
Council Decision:
N/A (Unknown)
Useful Links:
Development Description:
for the construction of a Single Wind Turbine development on an 8.96-hectare site consisting of: -
I. A single 4.26-megawatt (MW) wind turbine with an overall tip height of 159m, comprising a rotor diameter of 138m and a hub height 90m;
II. Wind turbine foundation, crane hardstanding and assembly area;
III. Temporary Construction Compound;
IV. Upgrade of an existing field entrance to new wind farm site entrance;
V. Upgrading and widening of existing access tracks;
VI. New access tracks;
VII. An on-site 20kV electrical substation, comprising of 2 Modular Substation Buildings;
VIII. Electrical and communication cabling within private lands;
IX. Tree felling, landscaping and reinstatement works; and
X. All associated ancillary works.
The operational lifespan of the development will be 35-years from the date of commissioning.
This Planning Application is not subject to a Natura Impact Statement (NIS) or Environmental Impact Assessment Report (EIAR).
Nearby Applications:
Appeals / Commencement
No Appeals Found
Decision Appealed:
- Appeal Submitted:
- Appeal Status:
- Appeal Decision:
- An Coimisiún Pleanála File Ref.:
- Note: If an appeal has been lodged and information isn't showing then this means An Coimisiún Pleanála hasn't published the data for reuse by PlanningAlerts.ie. You will need to follow up directly on the ACP website. Use the reference number, above, if available.
No Commencement Found
Commencement Information:
- Notice Submitted:
- Start Date:
- BCMS Notice:
- View on BCMS Website
Copyright:
Planning Data is published by Department of Housing, Planning and Local Government and is licensed under a Creative Commons Attribution-NoDerivatives 4.0 International License.