MSD Ireland (Ballydine) , Ballydine Kilsheelan Clonmel , Co. Tipperary
Apr 03 2025
DecisionApr 07 2025
Decision DueMay 07 2025
GrantedMay 06 2030
Expiry (if required)-
Submitted: 11 / 02 / 2025
-
Application Type:
PERMISSION -
Application Status:
APPLICATION FINALISED -
Council Decision:
CONDITIONAL (Granted)
Useful Links:
Development Description:
the development of a new purified water utility (PuW) building. The development will consist of: i) a new purified water utility (PuW) building with two no. levels, to provide a gross floor area of approximately 281 square meters and a maximum height of 15.0 meters at the building stair core; ii) all associated site development and ancillary works including modifications to footpaths, drainage and utility services, service connections to existing high-level piperacks and landscaping works. The proposed development is located on a site that operates under an existing Industrial Emissions (IE) Licence under Part IV of the Environmental Protection Agency Act 1992 (as amended for the Protection of the Environment Act, 2003). The proposed development is on a site which the Chemicals Act (Control of Major Accident Hazards Involving Dangerous Substances) Regulations 2015 applies
Nearby Applications:
Appeals / Commencement
No Appeals Found
Decision Appealed:
- Appeal Submitted:
- Appeal Status:
- Appeal Decision:
- An Coimisiún Pleanála File Ref.:
- Note: If an appeal has been lodged and information isn't showing then this means An Coimisiún Pleanála hasn't published the data for reuse by PlanningAlerts.ie. You will need to follow up directly on the ACP website. Use the reference number, above, if available.
No Commencement Found
Commencement Information:
- Notice Submitted:
- Start Date:
- BCMS Notice:
- View on BCMS Website
Copyright:
Planning Data is published by Department of Housing, Planning and Local Government and is licensed under a Creative Commons Attribution-NoDerivatives 4.0 International License.