840m |
22/12/2023 |
N/A |
Derryville Moyne , Thurles , Co. Tipperary |
the construction of an 1,800 sq.m sludge holding building of c. 60m in length, 30m in width and 13.5m in height, to incorporate an open faced biofilter to be installed at the western end of the facility building, for the acceptance and temporary storage of up to 12,000 tonnes per annum of sludges produced from wastewater treatment; internal site roads and parking; a 50 sq.m welfare/office facility of c. 10m in length, 5m in width and 5m in height;... login required. |
Details... |
2.4km |
28/04/2023 |
CONDITIONAL |
Killoran , Thurles , Co. Tipperary |
development consisting of Workshop Building (1242m2), Truck Washout Building (64m2), commercial yard area, new boundary fence and entrance gates, an on-site Wastewater Treatment System and associated polishing filter bed perc... login required. |
Details... |
1.8km |
18/10/2022 |
CONDITIONAL |
Bruckana Windfarm , Bruckana , Johnstown |
to construct a new building to incorporate offices, a store, toilet facilities and a canteen and all associated siteworks... login required. |
Details... |
2.3km |
31/01/2022 |
CONDITIONAL |
Barnalisheen , Templetuohy , Thurles |
the following works: a) construction of a new, part two-storey, part single-storey detached dwelling; b) new detached garage; c) new site entrance; d) new connections to existing utilities; e) new waste-water treatment system & percolation area; f) all associated site works ... login required. |
Details... |
2.3km |
27/01/2022 |
N/A |
Barnalisheen , Templetuohy , Thurles |
Full planning permission for the following works: a) construction of a new, part two-storey, part single-storey detached dwelling; b) new detached garag... login required. |
Details... |
2.1km |
10/08/2021 |
CONDITIONAL |
Former Maintenance Depot Former Lisheen Mine , Kiloran , Moyne Thurles Co. Tipperary |
1) Demolition of the existing loading bay canopy 2) Change of use from maintenance depot to an agri-food sector Research and Development Unit for light indutrial use with ancillary office space 3) Extension of the existing first floor accomodation by 169 sqm. 4) Construction of an external stair to the rear, additional win... login required. |
Details... |
2.7km |
30/07/2021 |
CONDITIONAL |
Cooleeny , Derryfadda and Killoran , Co. Tipperary |
construction of a Solar PV development with a maximum export capacity (MEC) of up to 122MW comprising of ca. 214,800 no. photovoltaic panels laid out in arrays, the construction of a 38kV substation, (ca.57.31m2 x 4.45m tall) along with associated ancillary development including 30 no. Transformer Stations (ca. 7.27m2 ... login required. |
Details... |
2.7km |
21/07/2021 |
N/A |
DerryFadda , Cooleeny , Killoran |
construction of a Solar PV development with a maximum export capacity (MEC) of up to 122MW comprising of ca. 214,800 no. photovoltaic panels laid out in arrays, the construction of a 38kV substation, (ca.57.31m2 x 4.45m tall) along with associated ancillary development including 30 no. Transformer Stations (ca. 7.27m2 x... login required. |
Details... |
2km |
27/04/2021 |
N/A |
Killoran near Templetuohy , Co. Tipperary |
alterations to previously permitted wind farm development (planning register refs 14/510138 and 15/600924 (Tipperary), 14/202, 15/629, 19/787 and 20/459 (Kilkenny) and 14/139, 19/597 and 20/386 (Laois)) where the permitted development also extends into the townland of Bruckana, Baunmore and Rathpatrick in Co. Kilkenny and Graigueadrisly in Co.... login required. |
Details... |
2.6km |
25/02/2021 |
CONDITIONAL |
Killoran , Templetuohy , Thurles Co. Tipperary |
the as constructed extension to existing dwelling house and all associated site works and PERMISSION for new waste water treatment system... login required. |
Details... |
2.9km |
24/02/2021 |
CONDITIONAL |
Barnalisheen , Templetuohy , Co. Tipperary |
to build a carport/garage adjoining the rear of dwelling house and carry out all associated works... login required. |
Details... |