2.3km |
22/02/2024 |
CONDITIONAL |
Athasselabbey South , Golden , Co. Tipperary |
extension and renovation of existing dwelling, demolition of existing shed, de-commissioning of existing septic tank and percolation area and install new sewage treatment system and percolation area and associated site works... login required. |
Details... |
3km |
16/11/2023 |
CONDITIONAL |
Templenoe , Cashel , Co. Tipperary |
(1) the construction of an extension to an existing dwelling house, (2) associated remedial works to the existing dwelling house, (3) the construction of a private garage, (4) and all associated site works ... login required. |
Details... |
2.2km |
11/10/2023 |
N/A |
Cloghleigh , Golden , Co. Tipperary |
the construction of photovoltaic solar panels on ground mounted galvanised steel frames for our own farm use and all associated works ... login required. |
Details... |
2.2km |
29/09/2023 |
CONDITIONAL |
Cloughleigh , Golden , Co. Tipperary |
Two storey extension at rear of dwelling house; One ‘velux’ style roof window in the north (front) roof slope of house; Three additional ‘velux’ style roof windows in the south (rear) roof slope of house; Change of a window to a door on the south (rear) elevation of house; Enlargement of a window o... login required. |
Details... |
2km |
22/09/2023 |
CONDITIONAL |
Cloghleigh , Golden , Co. Tipperary |
new single storey dwelling house, effluent treatment system together with all associated site works... login required. |
Details... |
2.4km |
03/08/2023 |
CONDITIONAL |
Cloghleigh , Golden , Cashel Co Tipperary |
the construction of a new stable barn, ancillary underground soiled water tank and concrete apron and all Associated Works. The stable barn will be 28.8 m long , 14.15 mt wide a... login required. |
Details... |
2.8km |
27/07/2023 |
CONDITIONAL |
Athasselabbey South , Golden Cashel , Co. Tipperary |
change of house type from that already granted under planning file reference no. 20/1102 including all associated site works... login required. |
Details... |
2.1km |
27/06/2023 |
CONDITIONAL |
Ravenscroft , Suircastle Golden , Co. Tipperary |
for a concrete slab and for partial construction of a domestic garage/shed (base slab, walls etc) and for permission to complete works to include completion of walls, addition of roof and doors/window, associated surface water drainage and all associated works... login required. |
Details... |
2.7km |
17/06/2023 |
CONDITIONAL |
Belle Vue Park , New Inn , Cashel Co. Tipperary |
the construction of (I) a milking parlour incorporating dairy, plant, storage, meal bin, rain water storage tank, milk silo, holding yard with crush/ drafting yard, underground effluent tank with flow channel (ii) a loose shed (iii) walled silage pits and all associated site works... login required. |
Details... |
2.2km |
12/05/2023 |
CONDITIONAL |
Cloghleigh , Golden , Co. Tipperary |
(a) six mushrooms tunnels no’s 86, 87, 88, 89, 90 & 91. (b) building with central corridor area no 92. (c) four soil water tanks no 93, 94, 95 & 97 (d)construction o... login required. |
Details... |
2.1km |
02/05/2023 |
CONDITIONAL |
Cloghleigh , Golden , Co. Tipperary |
new single storey dwelling house with entrance and access road, effluent treatment system together with all associated site works... login required. |
Details... |
30m |
30/01/2023 |
N/A |
Cloghleigh , Golden , Cashel |
the erection and operation of asphalt plant (stack height 30 metres), together with an ancillary office unit (133.6 sqm G1A), a weighbridge, hardstanding, the ... login required. |
Details... |
2.2km |
13/12/2022 |
UNCONDITIONAL |
Cloghleigh , Golden , Co. Tipperary |
development of 12 mushroom tunnels with building canopy, also to replace mushroom tunnel no. 8 with dry store building and move mushroom tunnel no. 8 to new area on the site to no. 63, to include building canopy at one end of tunnel, proposed dry store building no. 64 to include cold store and packaging area. Proposed dry store building no. 61 will incorporate woodchip bo... login required. |
Details... |
1.8km |
09/12/2022 |
CONDITIONAL |
Lagganstown Lower , New Inn , Cashel |
a. conversion of the garage to a bedroom b. raising the ridge height of the roof c. the use of flat concrete tiles in lieu of slates on the roof d. the addition of roof lights to the front and sides of the main roof e. the conversion of the attic to storage space and bathroom f. the addition of a rear facing dormer to the converted attic bathroom g. alterations ... login required. |
Details... |
1.8km |
18/11/2022 |
N/A |
Lagganstown Lower , New Inn , Cashel Co. Tipperary |
variation to previously approved works (18601113) a) conversion of the garage to a bedroom, b) raising of ridge height of the roof, c) the use of flat concrete tiles in lieu of slates on the roof, d) the addition of roof lights to the front and sides of the main roof, e) the conversion of the attic to storage space and bathroom, f) the addition of a rear facing dormer to the converted attic ... login required. |
Details... |
2.6km |
27/10/2022 |
CONDITIONAL |
Boytonrath , New Inn Cashel , Co. Tipperary |
a single storey domestic extension to the side (West) elevation of the existing dwelling. Permission for a single storey extension to the front (North) elevation, a single storey extension to the rear (South) elevation and two storey extension to the... login required. |
Details... |
1.3km |
12/09/2022 |
CONDITIONAL |
Cloghleigh , Golden , Co. Tipperary |
a) a two-storey sustainable dwelling and adjoining garage, b) a domestic site entrance and roadway from existing farmyard, c) install a septic tank and percolation area, d) bore a new well and all associated site works... login required. |
Details... |
1.3km |
08/09/2022 |
N/A |
Cloghleigh , Golden , Co. Tipperary |
a) develop a two-storey sustainable dwelling and adjoining garage, b) develop a domestic site entrance and roadway from existing farmyard, c) install a septic tank and percolation area d) bore a new well and all associated site works... login required. |
Details... |
1.4km |
24/08/2022 |
N/A |
Cloghleigh , Golden , Co. Tipperary |
a) a two-storey sustainable dwelling and adjoining garage, b) develop a new site entrance from existing private lane, c) install a septic tank and percolation area d) bore a well and all associated site works... login required. |
Details... |