3km |
14/04/2024 |
N/A |
Ayle , Oola , Co. Tipperary |
the construction of a dwelling, domestic garage, site entrance, install on-site effluent treatment system including all associated site development works... login required. |
Details... |
2.5km |
14/12/2023 |
CONDITIONAL |
Longford West , Oola , Co. Limerick |
the demolition of existing rear annex to existing house, demolition of existing outbuilding, construction of a new extension to side of existing dwelling house, installation of a new upgraded domestic wastewater treatment system with polishing filter, together with all associated site works... login required. |
Details... |
1.2km |
11/10/2023 |
CONDITIONAL |
Cloonlusk , Doon , Co. Limerick |
change of house type under previously permitting governing permission Planning Reference Number 22/421 together with all associated site works... login required. |
Details... |
1.7km |
22/09/2023 |
CONDITIONAL |
Coolnamona , Doon , Co. Limerick |
the demolition of existing substandard dwellinghouse, construction of a vehicular entrance, replacement dwelling house, domestic garage, domestic waste water treatment system with polishing filter together with all associated site works... login required. |
Details... |
1.7km |
02/08/2023 |
CONDITIONAL |
Coolnamona , Doon , Co. Limerick |
the construction of a vehicular entrance, dwelling house, domestic garage, domestic waste water treatment system with polishing filter together with all associated site works... login required. |
Details... |
2.7km |
28/07/2023 |
CONDITIONAL |
Gortavalla South , Doon , Co. Limerick |
a new domestic dwelling, new garage, septic tank, percolation area, entrance and all associated site works... login required. |
Details... |
1.7km |
13/07/2023 |
N/A |
Coolnamona , Doon , Co. Limerick |
the construction of a vehicular entrance, dwelling house, domestic garage, domestic waste water treatment system with polishing filter together with all associated site works... login required. |
Details... |
2.1km |
30/06/2023 |
CONDITIONAL |
Portane , Pallasgreen , Co. Limerick |
the construction of a dwelling house, waste water treatment system and percolation area, entrance, garage and all ancillary site works... login required. |
Details... |
610m |
16/06/2023 |
CONDITIONAL |
Knockouragh , Carrig More(Td) , Doon |
the erection of a 24m high Lattice telecommunications support structure together with antennas, dishes and associated telecommunications equipment all enclosed in security fencing with an extension to an existing access track... login required. |
Details... |
2.7km |
22/02/2023 |
CONDITIONAL |
Ballyvalode , Oola , C0. Limerick |
the demolition of existing single storey extension and the construction of a new single storey extension to the rear of existing dwelling house, installation of a replacement domestic waste water treatment system with polishing filter together with all associated site works... login required. |
Details... |
3km |
02/01/2023 |
CONDITIONAL |
Ayle , Oola , Co. Tipperary |
dwelling, domestic garage, site entrance, install on-site effluent treatment system including all associated site development works... login required. |
Details... |
2.1km |
15/12/2022 |
CONDITIONAL |
Gortavalla East , Doon , Co. Limerick |
the construction of a dwelling house, waste water treatment system and percolation area, entrance, garage and all ancillary site works... login required. |
Details... |
1.7km |
08/12/2022 |
CONDITIONAL |
Toomaline Lower , Doon , Co. Limerick |
the retention of 3 Kennel buildings as constructed, fencing erected to enclose 3 greyhound runs as constructed, and ancillary works as constructed... login required. |
Details... |
670m |
02/12/2022 |
CONDITIONAL |
Moanduff , Doon |
an agricultural shed incorporating a slatted tank and all associated site works... login required. |
Details... |
2.1km |
16/11/2022 |
CONDITIONAL |
Gortavalla East/Cloonlusk , Doon , Co. Limerick |
the construction of an extension to the existing dwelling, installation of new domestic wastewater treatment system with polishing filter together with all associated site works... login required. |
Details... |
2.7km |
27/05/2022 |
CONDITIONAL |
Ballyvalode , Near Oola , Co. Limerick |
a 10-year permission for the construction of a 110kV ‘Loop In-Loop Out’ (LILO) substation and associated works on a site of approximately 6.20 hectares. This will include the following: A substation occupying 2.11 hectares, comprising: TSO (Eirgrid) compound with electrical equipment, transformer sub-compound, bus bars sub-compound, cable chairs and substation building (435m2), enclosed by palisade fencing at 0.95 hectares in area. One transformer up to 110kV within the TSO compound and the provision of an area for a second transformer if future Eirgrid expansion is required. Required TSO expansion area enclosed by palisade fencing at 0.79 hectares. Operators compound (with switchroom building, electrical equipment, rainwater collection system) enclosed by palisade fencing at 0... login required. |
Details... |
1.2km |
14/04/2022 |
CONDITIONAL |
Cloonlusk , Doon , Co. Limerick |
the construction of an entrance, dwelling house, garage, domestic wastewater treatment system with polishing filter together with all associated site works... login required. |
Details... |
2.4km |
09/02/2022 |
CONDITIONAL |
Gortnakisteen , Pallasgreen , Co. Limerick |
the construction of an entrance, dwelling house, domestic wastewater treatment system with polishing filter together with all associated site works... login required. |
Details... |
2.5km |
12/11/2021 |
REFUSED |
Ballyvalode Garryduff Gortnakistin Gortyvahane Keelogs Kilmacogue Moanoola and Moanroe , Co. Limerick |
a 10-year permission and 35 year operation for a solar farm on four land parcels as described herein; North Parcel(Gortnakistin townland) approximately 23.78 hectares, Central Parcel(Ballyvalode & Keeloges townlands) approximately 43.49 hectares, South Central Parcel(Gortyvahane and Moanroe townlands) approximately 34.7 hectares, South Parcel(Garryduff, Moanroe, Moanoola and Kilmacogue townland) approximately 39.27 hectares. The Central Parcel, South Central Parcel and South Parcel are collectively referred to as the Main Solar Farm; a route corridor of 0.58 hectares for an underground internal network cable along the R507 and L5040 public roads for approximately 600 metres and within the solar farm lands for approximately 1,260 metres. The total site area for the proposed development is approximately 141.8 hectares. The proposed development on these parcels comprises of 755,000sqm of solar photovoltaic panels on ground mounted steel frames; inverter/transformer stations; underground power and communication cables and... login required. |
Details... |
2.5km |
29/10/2021 |
CONDITIONAL |
Ballyvalode , Oola , Co. Limerick |
the construction of a new dwelling house, effluent treatment system & percolation area, new entrance, driveway, boundary alterations as may be required, associated siteworks as may be required... login required. |