Ballybeg Turbeagh Co.Cork

May 31 2024

Application Received

Jul 25 2024

Decision Due
  • Submitted: 31 / 05 / 2024
  • Application Type:
    PERMISSION
  • Application Status:
    INCOMPLETED APPLICATION
  • Council Decision:
    N/A (Unknown)

Useful Links:

Development Description:

Permission to construct a photovoltaic (Solar PV) energy generation scheme with a total area of 3.76ha within the townland of Ballybeg & Turbeagh, Co. Cork. The development will consist of the installation of 4,186 no. ground mounted Solar PV arrays, a 20kV substation, the installation of 120m of 20kV underground electrical cabling from the proposed substation to an existing pole and overhead line to connect to the national grid, the upgrade of an existing entrance off the local road to serve as a permanent site entrance for the solar farm and all associated site development works including upgrading 80m of existing tracks and installing 435m of new access track of 3m wide and all associated site works. The applicant is seeking a 10-year planning permission and an operational period of 40 Years.

Nearby Applications:

Appeals / Commencement

No Appeals Found

Decision Appealed:

  • Appeal Submitted:
  • Appeal Status:
  • Appeal Decision:
  • An Coimisiún Pleanála File Ref.:
  • Note: If an appeal has been lodged and information isn't showing then this means An Coimisiún Pleanála hasn't published the data for reuse by PlanningAlerts.ie. You will need to follow up directly on the ACP website. Use the reference number, above, if available.

No Commencement Found