-
Submitted: 19 / 03 / 2025
-
Application Type:
RETENTION -
Application Status:
APPLICATION FINALISED -
Council Decision:
CONDITIONAL (Granted)
Useful Links:
Development Description:
permission for the the widened main entrance to accommodate two-way traffic, demolition of an existing outbuilding and construction of a new machinery storage building incorporating public toilet facilities, installation of a proprietary wastewater treatment system, and all associated drainage and site works. Installation of a covered spectator stand. Redevelopment of the existing main pitch to a full-size grass GAA playing field, including pitch fencing and an elevated scoreboard. Conversion of the existing training pitch to a 4G synthetic playing surface with perimeter fencing. Installation of a dedicated pedestrian entrance from the main road to improve access and safety. Development of a perimeter walking trail and associated landscaping works
Nearby Applications:
Appeals / Commencement
No Appeals Found
Decision Appealed:
- Appeal Submitted:
- Appeal Status:
- Appeal Decision:
- An Coimisiún Pleanála File Ref.:
- Note: If an appeal has been lodged and information isn't showing then this means An Coimisiún Pleanála hasn't published the data for reuse by PlanningAlerts.ie. You will need to follow up directly on the ACP website. Use the reference number, above, if available.
No Commencement Found
Commencement Information:
- Notice Submitted:
- Start Date:
- BCMS Notice:
- View on BCMS Website
Copyright:
Planning Data is published by Department of Housing, Planning and Local Government and is licensed under a Creative Commons Attribution-NoDerivatives 4.0 International License.