2km |
27/03/2024 |
N/A |
Castlelough/Castletown , Portroe , Nenagh |
domestic garage with loft and domestic store as constructed... login required. |
Details... |
130m |
12/02/2024 |
CONDITIONAL |
Laghtea , Portroe , Nenagh |
domestic car port and stores as constructed... login required. |
Details... |
820m |
22/12/2023 |
CONDITIONAL |
Laghtea , Portroe , Nenagh |
to renovate and extend existing cottage, construct a domestic storage shed, install a new waste water treatment system along with all ancillary site works... login required. |
Details... |
2km |
22/11/2023 |
N/A |
Castletown/Castlelough , Portroe , Nenagh |
domestic store as constructed... login required. |
Details... |
2.1km |
22/11/2023 |
N/A |
Coolbaun , Ballina , Co. Tipperary |
House as built and permission to complete partially built house and construct a site entrance, treatment system and percolation area and all other ancillary site works... login required. |
Details... |
2km |
29/09/2023 |
N/A |
Castletown/Castlelough , Portroe , Nenagh |
domestic store as constructed... login required. |
Details... |
1.4km |
14/09/2023 |
CONDITIONAL |
Ballingeer , Portroe , Co. Tipperary |
a dwelling, entrance, garage, sewage treatment system and all ancillary works... login required. |
Details... |
2.2km |
22/08/2023 |
CONDITIONAL |
Castlelough , Portroe , Nenagh Co. Tipperary |
revised site boundaries complete with all ancillary site works associated with the development and PERMISSION to refurbish and extend existing dwelling house by adding a two-bedroom extension to the east side, an extended dining area to the west side and an extended kitchen area to the front south side, a... login required. |
Details... |
630m |
21/08/2023 |
CONDITIONAL |
Townlough Lower , Ballina , Co. Tipperary |
extension of existing dwelling house along with all ancillary site works... login required. |
Details... |
2.2km |
04/08/2023 |
N/A |
Castlelough , Portroe , Nenagh Co. Tipperary |
revised site boundaries complete with all ancillary site works associated with the development and PERMISSION to refurbish and extend existing dwelling house by adding a two-bedroom extension to the east side, an extended dining area to the west side and an extended kitchen area to the front south side, a... login required. |
Details... |
2.2km |
26/07/2023 |
N/A |
Castlelough , Portroe , Nenagh Co. Tipperary |
refurbish and extend existing dwelling house by adding a two-bedroom extension to the east side, an extended dining area to the west side and an extended kitchen area to the front south side, a new flat roof canopy over front entrance and a new flat roofed... login required. |
Details... |
1.5km |
06/06/2023 |
CONDITIONAL |
Fermoyle , Castletown Portroe , Co. Tipperary |
a single storey extension to an existing dwelling house, roof modifications to include for new dormer windows and modifications to the external finishes & elevations... login required. |
Details... |
1.5km |
22/05/2023 |
N/A |
Fermoyle , Castletown Portroe , Co. Tipperary |
the construction of a single storey extension to an existing dwelling house, roof modifications to include for new dormer windows and modifications to the external finishes & elevations... login required. |
Details... |
400m |
05/05/2023 |
CONDITIONAL |
Castletown , Portroe , Nenagh Co. Tipperary |
(1) dwelling house as constructed (granted permission under PL ref 04510245 ), (2) domestic garage as constructed and PERMISSION for (1) upgrade of existing waste water system, (2) installation of 2 no. dormer windows to rear of dwelling to first floor bedrooms... login required. |
Details... |
1.4km |
01/02/2023 |
N/A |
Ballingeer , Portroe , Co Tipperary |
existing mobile home and all associated ancillary works on a temporary basis and Permission for dwelling, entrance, garage, sewage treatment system and all ancillary works... login required. |
Details... |
1.3km |
30/12/2022 |
N/A |
Cooneen , Portroe , Co. Tipperary |
a single storey dwelling, treatment plant, entrance and all ancillary works ... login required. |
Details... |
1.5km |
22/12/2022 |
N/A |
Ballingeer , Portroe , Co. Tipperary |
a dwelling, entrance, garage, sewage treatment system and all ancillary works and
retention of existing mobile home and all associated ancillary works on a temporary basis... login required. |
Details... |
2.8km |
14/12/2022 |
CONDITIONAL |
Ballywilliam , Portroe , Nenagh Co. Tipperary |
(a) the modification and set back of the existing farm entrance including set back of portion of adjoining field boundary to provide adequate sightlines as previously granted planning (Pl. Ref: 06510969) (b) the demolition of existing derelict milking parlour and farm buildings in the yard (c) the construction of an agricultural shed comprising of milking parlour,... login required. |
Details... |
2.7km |
12/12/2022 |
N/A |
Ballywilliam , Portroe , Nenagh Co. Tipperary |
(a) to modify and set back existing farm entrance including set back of portion of adjoining field boundary to provide adequate sightlines as previously granted planning (Pl. Ref: 06510969)
(b) to demolish existing derelict milking parlour and farm buildings in the yard
(c) to construct an agricultural shed comprising of milking parlour, dair... login required. |
Details... |