1.1km |
06/05/2024 |
N/A |
Ardiluan Guest House , Gort Road , Ennis |
to extend the caretaker/ owner’s dwelling apartment comprising an access balcony at ground level and an additional bedroom ensuite at the first-floor level. Proposed modifications to the guest house will comprise of the following; conversion of the storage semi-basement to two guest bedrooms and a games room, conversion of the existing games room on the ground floor t... login required. |
Details... |
2.6km |
18/04/2024 |
N/A |
Ballymaquiggin , Ennis , Co. Clare |
for the following works: (A) Renovate and change the layout and elevations of the existing dwelling and garage (B) Change use of the garage as living accommodation (C) Construct ground... login required. |
Details... |
670m |
02/04/2024 |
N/A |
Ballymaley , Ennis , Co. Clare |
for the Installation of a Modular Home to be used as Ancillary Living Accommodation with connection to existing wastewater treatment system including ancillary site works... login required. |
Details... |
2.3km |
28/03/2024 |
N/A |
Nutfield , Barefield , Co Clare |
for proposed development which will consist of the construction of a single-storey dwelling house, wastewater treatment system, percolation area, private well, upgrades to existing entrance, and all ancillary site works.... login required. |
Details... |
1.1km |
20/03/2024 |
CONDITIONAL |
Ballyallia , Ennis , Co Clare |
for the construction of an extension to the rear of an existing dwelling house and carrying out alterations to the existing dwelling along with ancillary works... login required. |
Details... |
2.9km |
11/03/2024 |
CONDITIONAL |
Knockanean , Ennis , Co. Clare |
for development which will consist of the construction of a dwelling house, garage, a proprietary waste water treatment system and ancillary site works... login required. |
Details... |
1.6km |
06/03/2024 |
CONDITIONAL |
Barefield , Ennis , Co Clare |
to construct an extension to comprise of a kitchen/living, bathroom, bedroom and playroom, including ancillary site works... login required. |
Details... |
1.4km |
29/02/2024 |
N/A |
The Maples , Ennis , Co. Clare. |
for a development comprising 48 no. residential units, (32 no. semi-detached houses, 8no. terrace houses and 8 no. duplex apartments), ancillary surface car parking, vehicular & pedestrian access to the proposed development including a new road, footpath and cyclepath extensions from the existing development to serve the new units, connec... login required. |
Details... |
1.9km |
26/02/2024 |
CONDITIONAL |
Ash View , Tulla Road , Ennis |
of a rear extension to existing dwelling house, change of use of garage to bedrooms, two number windows on front elevation, all associated site works.... login required. |
Details... |
820m |
07/02/2024 |
REFUSED |
Ballyduff , Barefield , Ennis Co Clare V95 D6XA |
for proposed change of use and extension of existing garage to residential unit, connection to existing waste water treatment system on site, and associated site works ... login required. |
Details... |
1.6km |
29/01/2024 |
REFUSED |
Ballymulqueeny , Barefield , Co. Clare |
for the construction of a dwelling house, garage, a proprietary waste water treatment system and ancillary site works... login required. |
Details... |
1.6km |
29/01/2024 |
REFUSED |
Ballymulqueeny , Barefield , Co. Clare |
for the construction of a dwelling house, garage, a proprietary waste water treatment system and ancillary site works... login required. |
Details... |
1.9km |
19/12/2023 |
N/A |
Ash View , Roslevan , Ennis |
the development will consist of a rear extension to the existing dwelling house, change of use of existing garage to bedrooms, two number new windows on front elevation of the existing dwelling house, all associated site works.... login required. |
Details... |
1.7km |
18/12/2023 |
N/A |
Gracelands , Barefield , Ennis Co. Clare |
for the change of use of existing vacant bakery building into 3 no. one bedroomed apartment units together with all ancillary site works required to facilitate the proposed development ... login required. |
Details... |
2.9km |
18/12/2023 |
CONDITIONAL |
Cappaghbeg , Barefield , Co Clare |
to construct dwelling house, garage , proprietary treatment system, bored well and carry out ancillary site works ... login required. |
Details... |
2.5km |
14/12/2023 |
N/A |
Tooreen , Ennis , Co Clare |
for development, the development will consist of a new dwelling house, new garage, new site entrance and wastewater site works and below ground... login required. |
Details... |
820m |
23/11/2023 |
N/A |
Ballyduff , Barefield , Ennis Co Clare V95 D6XA |
for proposed change of use and extension of existing garage to residential unit, connection to existing waste water treatment system on site, and associated site works ... login required. |
Details... |
2.5km |
13/11/2023 |
CONDITIONAL |
Ballymaquiggin , Ennis , Co Clare |
to construct a dwelling house and garage, with effluent treatment system, new entrance from public road, and all associated site works... login required. |
Details... |
1.5km |
30/10/2023 |
CONDITIONAL |
4 Ashfield Park , Gort Road , Ennis Co. Clare |
of works to the rear boundary wall of property including raising the wall height, adding piers and the installation of 2 access doors.... login required. |
Details... |
30m |
20/10/2023 |
REFUSED |
Ballymaley Business Park , Gort Road Ennis , Co. Clare |
is sought for the use of the retail warehouse unit, permitted under Reg. Ref.: 23/60085, for the sale of household goods, including furniture and furnishings, household appliances, and tools and equipment for the house and garden, as per the range of goods set out in the application documentation.... login required. |
Details... |