Montpelier and Fairyhall , Limerick.
Mar 16 2026
Decision Due-
Submitted: 19 / 12 / 2025
-
Application Type:
PERMISSION -
Application Status:
NEW APPLICATION -
Council Decision:
N/A (Unknown)
Useful Links:
Development Description:
1. Raw Water Intake & Pumping Station site (RWI&PS) which will consist of: a Bankside Intake Chamber, Raw Water Pumping Station Building, 2 no. Microfiltration Buildings, Electricity
Substation, (Totalling 3,165m² Gross Floor Area (GFA), maximum building height of 10.9m over finished ground level); 4 no. surge vessels; associated below ground tanks; 670m access
road from the R494; 16 no. car parking spaces; telemetry mast (14.0m height); landscaping, lighting, and other ancillary above and below ground works; on a c. 4.1 ha permanent
site at Garrynatineel and Kilmaglassderry, Co. Tipperary, and associated re-profiling works to the Parteen Basin.
2. Raw Water Rising Mains (RWRM) which will consist of twin steel underground pipelines (each 1,500mm diameter) extending 2km from the pumping station at the RWI&PS site to the
Raw Water Balancing Tanks at the head of the proposed Water Treatment Plant, laid at a minimum depth of cover of 1.2m above crown of pipe.
3. Water Treatment Plant site (WTP) which will consist of: 2 no. Raw Water Balancing Tanks, 3 no. Water Treatment Module Buildings, 2 no. Sludge Dewatering Buildings, 2 no. Sludge
Storage Buildings, Chemical Dosing Manifold Building, Chemical Dosing Building, High Lift Pumping Station, an Electricity Substation, Washwater Settlement building, Control and
Visitor Building (Totalling c. 53,300m² GFA, maximum building height of 15.6m over finished ground level); associated pumping stations, lagoons, attenuation pond, above and below
ground tanks, 5 no. surge vessels; 640m access road from the R445; 50 no. car and 4 no. coach parking spaces; telemetry mast (14.0m height); ground and roof mounted PV panels;
landscaping, lighting, and other ancillary above and below ground structures and works; on a c.31 ha permanent site at Incha Beg, Knockadromin and Greenhills, Birdhill, Co. Tipperary.
4. A single 1,600mm diameter steel underground treated water pipeline (covering a distance of approximately 37km in County Tipperary) extending in a generally north-eastern
alignment between the proposed Water Treatment Plant and the proposed Break Pressure Tank, laid at a minimum depth of cover of 1.2m above crown of pipe.
5. Break Pressure Tank (BPT) site which will consist of: a below ground covered Break Pressure Tank (volume 13,776m3); control building (c. 800m² GFA, 7.5m height); 794m access road
from the L1064; 10 no. car parking spaces; telemetry mast (14.0m height); ground and roof mounted PV panels; Bat
Nearby Applications:
Appeals / Commencement
No Appeals Found
Decision Appealed:
- Appeal Submitted:
- Appeal Status:
- Appeal Decision:
- An Coimisiún Pleanála File Ref.:
- Note: If an appeal has been lodged and information isn't showing then this means An Coimisiún Pleanála hasn't published the data for reuse by PlanningAlerts.ie. You will need to follow up directly on the ACP website. Use the reference number, above, if available.
No Commencement Found
Commencement Information:
- Notice Submitted:
- Start Date:
- BCMS Notice:
- View on BCMS Website
Copyright:
Planning Data is published by Department of Housing, Planning and Local Government and is licensed under a Creative Commons Attribution-NoDerivatives 4.0 International License.