2.3km |
16/11/2023 |
CONDITIONAL |
Bartleystown , Clonlara , Co Clare |
of as constructed shed and all associated site works... login required. |
Details... |
2.9km |
18/08/2023 |
CONDITIONAL |
Erina Canal Lockhouse , Clonlara , Co Clare |
to renovate existing Erina canal Lock house and outbuilding, to include new roof, windows, doors and stabilisation of existing masonry walls... login required. |
Details... |
1.3km |
23/06/2023 |
CONDITIONAL |
Leitrim , Kilmore , Co Clare |
for the provision of a roofed structure for dry effluent storage (dugstead) and all associated site works ... login required. |
Details... |
2km |
12/04/2023 |
N/A |
Fahy More North Td , Bridgetown , Co Clare |
to fill the existing poor quality agricultural land with stone and soil in order to raise the level of the ground, using existing site entrance, including all ancillary site works... login required. |
Details... |
2.2km |
23/03/2023 |
CONDITIONAL |
Springmount , Kilmore , County Clare |
to construct a single dwelling house, garage, advanced wastewater treatment system along with ancillary site works... login required. |
Details... |
3km |
09/03/2023 |
REFUSED |
Fahy Beg Fahy More North Ballymoloney Ballyknavin (Ed O'Briensbridge) Ballyquin More , Woodpark Leitrim Fahy More South Ballybrack Aharinaghmore Tooreen , (Ed Cloghera) Aharinaghbeg Knockdonagh Roo East Blackwater Rosmadda West Parkroe Lackyle (Ed |
for development of a wind farm in the townlands of Fahy Beg, Fahy More North, Ballymoloney, Ballyknavin (Ed O'Briensbridge), Balllyquin More, Woodpark and Leitrim, Co Clare together with the development of an underground grid connection cable to the national grid. The underground grid connection is located primarily within the public road within the townlands of Leitrim, Fahy More South, Ballybrack, Aharinaghmore, Tooreen (Ed Cloghera) Aharinaghbeg, Knockdonagh, Roo East, Blackwater, Rosmadda West, Parkroe, Lackyle (Ed Ballyglass) and Castlebank, Co Clare. Temporary accommodation works to facilitate the delivery of wind turbine components to the site will be required in the townland of Ardataggle, Co Clare. The development will consist of: Construction of 8 no. wind turbines with a blade tip height range from 169m to 176.5m, a hub height range from 102.5m to 110m and a rotor diameter range from 131m to 138m; Erection of 1 no. permanent meteorological mast to a height of 100m above ground level; Construction of 1 no. onsite 38kV electrical substation to ESB Networks (ESBN) specifications and associated compound including Welfare facilities, Electrical infrastructure, Parking, Wastewater holding tank, Rainwater harvesting tank, Sec... login required. |
Details... |
2km |
01/03/2023 |
N/A |
Fahy More North Td , Bridgetown , Co Clare |
to fill the existing poor quality agricultural land with stone and soil in order to raise the level of the ground, using existing site entrance, including all ancillary site works... login required. |
Details... |
470m |
16/02/2023 |
N/A |
Ballybrack , Clonlara , Co. Clare |
to RETAIN (a) importation of inert material to site of 17.05.04 2,700 tons and (b) permission to import inert materials to site to improve the lands for good agricultural land ... login required. |
Details... |
2.1km |
03/02/2023 |
N/A |
Aughboy , Clonlara , Co. Clare |
for the demolition of existing semi-derelict dwelling house, construction of replacement detached dormer dwelling house, onsite wastewater treatment system and percolation area, bored well, connection to necessary services, together with all associated ancillary and incidental site works... login required. |
Details... |
2.5km |
01/12/2022 |
N/A |
Springmount , Kilmore , Co Clare |
to demolish existing derelict dwelling house and existing shed and for the construction of a new replacement dwelling house, wastewater treatment system and all ancillary site works ... login required. |
Details... |
730m |
19/10/2022 |
CONDITIONAL |
Ballybrack , Bridgetown , Co Clare |
of domestic garage/store and all associated site works ... login required. |
Details... |
2.3km |
11/10/2022 |
N/A |
Faheymore North , O'Briensbridge , Co. Clare |
for development which will consist of the restoration of part of an extant sand and gravel quarry to agricultural grassland. The development is necessary to address condition no. 8 and 9 of A... login required. |
Details... |
800m |
27/09/2022 |
CONDITIONAL |
Fahy More South , Kilmore , Co. Clare |
for the construction of a dwelling house, garage, entrance, wastewater treatment system and all ancillary site works.... login required. |
Details... |
460m |
26/07/2022 |
N/A |
Ballybrack , Clonlara , Co Clare |
to improve agricultural land by placing inert fill using existing access to the lands ... login required. |
Details... |
1.8km |
30/06/2022 |
REFUSED |
Kilmore , Co Clare |
to construct a dwelling house, entrance, waste water treatment system and associated site works... login required. |
Details... |
1.8km |
22/04/2022 |
CONDITIONAL |
Ballybrack , Clonlara , Co. Clare |
to construct a dwelling, domestic garage, bored well, wastewater treatment system with soil polishing filter together with all associated site development works and services... login required. |
Details... |
2.3km |
17/02/2022 |
CONDITIONAL |
9 Monaskeha , Clonlara , Co Clare |
of as constructed garden shed and glasshouse and also RETENTION permission for garage conversion to sitting room in dwelling house, ... login required. |
Details... |
2.7km |
07/02/2022 |
N/A |
Fahy Beg , Bridgetown , Co Clare |
for the demolition of existing semi-derelict dwelling house, construction of replacement detached dormer dwelling house, onsite wastewater treatment system ... login required. |
Details... |
2.8km |
22/12/2021 |
CONDITIONAL |
Ardataggle , O'Brien's Bridge , Co Clare |
the development will consist of one two-storey dwelling house, wastewater treatment system, percolation area, new site entrance, driveway and all associated site works... login required. |
Details... |