Skip to main content
Our Subscriber Plan is now 50% off Discount expires on Wednesday, 19 August 2026. Get in touch about our Business Accounts and generate a free test alert.
Advertisement
Signup or Login to go ad-free

Waterways Ireland Shannon Navigation , Limerick Navigation Abbey River and Shannon River (center point ITM easting 558124 northing 658029) and Park Canal (ITM Eating 559079 Northing 657734) , Limerick City

Jul 18 2025

Application Received

Sep 11 2025

Decision

Sep 11 2025

Decision Due

Oct 16 2025

Granted

Oct 15 2030

Expiry (if required)
  • Submitted: 18 / 07 / 2025
  • Application Type:
    PERMISSION
  • Application Status:
    APPLICATION FINALISED
  • Council Decision:
    CONDITIONAL (Granted)

Useful Links:

Development Description:

The development, Limerick Navigation and Park Canal 5-year Maintenance Works along the Abbey River and Shannon River Navigation from Quay Lock to Ardnacrusha Tail Race junction and the Park Canal, in the townlands of Rebouge, Rebouge Island, Park, Monamuck, Irishtown, St. Francis Abbey, English Town, King’s Island, Corbally, Monabraher, Co. Limerick., will consist of essential maintenance works along the Shannon Navigation and Park Canal, as outlined in the Construction Environmental Management Plan (CEMP) submitted with the planning application and in accordance with Waterways Ireland’s statutory remit comprising of the following: • Removal from the navigation, along the Abbey River and River Shannon to the Ardnacrusha Tail Race, overhanging branches and infringing trees (including dead trees) that have fallen over more than 60 degrees out into the navigation channel causing a hazard to passing vessels. • Maintenance of overgrown vegetation impacting and overgrowing the water portion of the Park Canal, aquatic weed management as required, and removal of debris and litter. • Maintenance of the south back drain associated with the Park Canal. • Removal of vegetation impacting Park Canal structures and undertaking necessary physical minor repairs to Quay/Limerick Lock Chamber and associated Footbridge, Troy’s/Park Lock Chamber and Park Bridge and associated canal or lock wing and quay walls. The proposed works will involve maintenance to, but not altering the materials or the character of Protected Structures No. 6063 Canal Footbridge at Lock Quay and No. 6064 Canal Quay and Lock Walls at Lock Quay. The vegetation works will involve working within close proximity to or within the curtilage of, but not undertaking any works to, RPS No. 3478 Stone and Brick buildings at Quay Lock, RPS No. 3319 Lock Quay Carriage Arch, RPS No. 6058 O’Dwyers Bridge and RPS No. 3314 Athlunkard Boat Club An Ecological Impact Assessment (EcIA) and Natura Impact Statement (NIS) accompany the planning application

Nearby Applications:

Appeals / Commencement

No Appeals Found

Decision Appealed:

  • Appeal Submitted:
  • Appeal Status:
  • Appeal Decision:
  • An Coimisiún Pleanála File Ref.:
  • Note: If an appeal has been lodged and information isn't showing then this means An Coimisiún Pleanála hasn't published the data for reuse by PlanningAlerts.ie. You will need to follow up directly on the ACP website. Use the reference number, above, if available.

No Commencement Found

Commencement Information:

Copyright:

Creative Commons LicensePlanning Data is published by Department of Housing, Planning and Local Government and is licensed under a Creative Commons Attribution-NoDerivatives 4.0 International License.