970m |
05/02/2024 |
CONDITIONAL |
9 Aisling Drive , Clareview , Limerick |
conversion of garage to a bedroom and bathroom with new roof, construction of a single storey rear extension, conversion of attic to a home office/gym with 3 no.... login required. |
Details... |
1000m |
26/01/2024 |
CONDITIONAL |
1 Merval Drive , Clareview , Limerick |
the demolition of an existing single storey extension and the construction of a new single storey extension to rear of the house. The new roof is to include rooflights, internal modifications and all ancillary site works... login required. |
Details... |
510m |
22/12/2023 |
N/A |
23 Kilbranish Drive , Woodview , Limerick |
extension to the first floor and planning permission for a change of use for the entire building from a doctors surgery to a dwelling house... login required. |
Details... |
540m |
20/12/2023 |
CONDITIONAL |
Ballygrennan , Moyross Avenue , Moyross Limerick |
the development that comprises (a) 73 no. residential units including (i) 34 no. 2 storey 3 bed units; (ii) 6 no. 2 storey 4 bed units; (iii) 6 no. 3 storey 4 bed units; and (iv) 27 no. 3 storey 3 bed units; (b) a 4 storey neighbourhood centre including (i) 42 no. 2 bed elderly housing apartment unit with communal roof garden; (ii) pharmacy with drive-through dispensary window; (iii) coffee shop with external seating area; (iv) local convenience retail unit; (v) day centre and all ancillary rooms; (vi) ESB-substation, switch room, plant room and bin store; (c) 3 storey 90-bed nursing home complete with all necessary roof mounted plant and a service yard to accommodate additional plant and equipment including a sprinkler tank, an ESB sub-station with switch room and bin stores; and (d) all associated site works inc... login required. |
Details... |
510m |
11/12/2023 |
CONDITIONAL |
TUS Moylish Campus , Moylish Park , Limerick |
the 2-storey extension to provide a new lift to the TUS Sportshub Building and all associated site works... login required. |
Details... |
650m |
05/12/2023 |
CONDITIONAL |
TUS Moylish Campus , Moylish Park , Limerick |
alterations to the Aula Maxima Building comprising of a new escape stairs & 6no. lecture rooms at first floor... login required. |
Details... |
610m |
05/12/2023 |
N/A |
TUS Moylish Campus , Moylish Park , Limerick |
a temporary prefabricated building for use as a classroom and all related site development works including roads, parking and drop-off area... login required. |
Details... |
720m |
16/11/2023 |
CONDITIONAL |
Ballygrennan , Moyross Avenue , Moyross Limerick |
the development of a new Ambulatory Medical Facility at Ballygrennan, Moyross Avenue, Moyross, Limerick. The development will consist of two distinct phases of development including: (i) Phase 1 Medical Unit – a single-storey medical unit, encompassing a total floor area of c. 3,297sqm comprising of medical consulting, diagnostic and treatment rooms, and associated ancillary plant rooms including louvred screened plant area at roof level for plant equipment and solar PV panels; a secure service yard; covered bin storage compound; and gas skid enclosure; and (ii) Phase 2 Medical Unit – a 4 storey medical unit, encompassing a total floor area of c. 9,132sqm comprising of medical consulting, diagnostic and treatment rooms, ancillary restaurant / coffee shop, and associated ancillary rooms including louvred screened plant area at roof level for plant equipment and solar PV panels; a secure service yard; and covered bin storage compound. The internal layouts of Phase I & Phase II buil... login required. |
Details... |
440m |
16/11/2023 |
CONDITIONAL |
No.35 Glenanaar Avenue , Woodview Park , Limerick |
the construction of 1 no. single storey garage/utility room to the side of existing dwelling and all associated site works... login required. |
Details... |
3km |
02/11/2023 |
CONDITIONAL |
Mountgordon , Meelick , Co Clare |
for the demolition of an existing domestic shed, construction of a new domestic garage and alterations to the front elevation of the existing dwelling... login required. |
Details... |
910m |
24/03/2023 |
CONDITIONAL |
"Rockmount" , 146 Mayorstone Upper , Mayorstone |
domestic use for the following, (i) entrance access to rear garden, (ii) raising the rear garden boundary wall, (iii) alteration to the front facade of the dwelling... login required. |
Details... |
900m |
10/03/2023 |
CONDITIONAL |
Ballynanty More and Monabraher , adjacent to the R464 Kileely Road , Limerick |
the Temporary access/haul road on lands adjacent to the Coonagh to Knockalisheen Distributor Road Scheme. The proposed works include the construction of a temporary access/haul road extending from the R464 Kileely Road to the rear of the Knockalisheen Bays Estate to link with the existing Estate Roads. The location of the works is in the townlands of Ballynanty More and Monabraher adjacent to the R464 Kileely Road, Limerick. Limerick City & County Council has carried out an Environmental Impact Assessment (EIA) Screening Report in accordance with the requirements of Article 120(1B)(b)(i) and has determined that there is no r... login required. |
Details... |
2.8km |
16/02/2023 |
CONDITIONAL |
Mountgordon , Meelick , Co. Clare |
on the grant of outline permission (Ref. No. P21/899) to build a dwelling house, private garage, vehicular entrance, wastewater treatment system and ancillary site works... login required. |
Details... |
880m |
25/11/2022 |
CONDITIONAL |
147 Mayorstone Upper , Mayorstone , Limerick |
the renovation, alteration and extension of the existing dwelling house, to include the following: (a) construct extension to the side of the existing house; (b) make elevational changes to the existing house; (c) widen existing vehicular entrance; and (d) all associated site works... login required. |
Details... |
350m |
01/11/2022 |
CONDITIONAL |
Corpus Christi Primary School , Moyross , Limerick |
a new Special Education Needs base extension with 2 No. classrooms, central activity space, main entrance and lobby, administration offices, storerooms, toilets and ancillary spaces, and within the existing school, an extension comprising construction of a multi sensory room and 4 No. Special Education Teachers off... login required. |
Details... |
910m |
27/10/2022 |
CONDITIONAL |
Kileely Road , Kileely , Co. Limerick |
(i) demolition of part of the existing single-storey building, including north, south and west elevations with the retention of the east/front elevation, removal of the entire existing roof and of a single-storey ancillary structure to the rear. (ii) Construction of a new single-storey flat-roofed extension to the rear and side, which together with the retained part of the existing building is to provide a new larger single retail unit. (ii... login required. |
Details... |
270m |
21/10/2022 |
CONDITIONAL |
28 Lyradane Avenue , Woodview Park , Limerick |
the construction of a single storey extension to the side and rear of the existing dwelling house and all ancillary site works... login required. |
Details... |
950m |
26/09/2022 |
CONDITIONAL |
108 Mayorstone Grove , Limerick |
the demolition of an existing single storey side and rear extension to the existing dwelling and detached garden shed. Construction of a new two storey... login required. |
Details... |
850m |
19/08/2022 |
CONDITIONAL |
6 Ballynanty Road , Ballynanty , Limerick |
single storey extensions as constructed to side and rear of existing semi-detached dwelling, together with all incidental ancillary and site works... login required. |
Details... |