Regeneron Ireland DAC , Raheen Business Park , Ballycummin Co. Limerick
Jan 30 2026
Further Info. RequestedJul 13 2026
Further Info. ReceivedAug 04 2026
DecisionAug 09 2026
Decision DueAug 17 2026
Appeal Submitted-
Submitted: 28 / 11 / 2025
-
Application Type:
PERMISSION -
Application Status:
APPEALED -
Council Decision:
CONDITIONAL (Granted)
Useful Links:
Development Description:
refurbishment and extension of existing outbuildings and construction of an Event Center building within the associated courtyard, located on the campus of the existing production facility. The development is for the purpose of providing a company Event Centre building of approximately 1,460.0 square meters floor area and maximum height of 7.7 meters to include a conference/event/training space, meetings rooms, vendor units, stores, plant rooms, and welfare areas. The proposed Event Centre will include ancillary open areas comprising; an Entrance Courtyard area; a landscaped Forecourt area; and 2 no. open plant yards. Proposed drainage works will include 2 no. underground surface water soakaway attenuation tanks to direct rooftop and other surface water from the development to ground infiltration, and no surface water from the proposed building will discharge to the Loughmore Canal. Refurbishment and conservation works are also proposed to the existing single storey building of approximately 22.0 square meters floor area, identified as Building 12, adjacent to Roche Castle. Other associated developments will comprise footpaths, service provisions, landscaping, and all associated site works. The proposed development is within the curtilage of Roche Castle, a protected structure (Record of Protect Structures Reg. No.1671).
This application relates to development on a landholding that comprises an activity which holds an Industrial Emissions Licence (Reg. No. P0991-02) issued by the Environmental Protection Agency
Nearby Applications:
Appeals / Commencement
No Appeals Found
Decision Appealed:
- Appeal Submitted:
- Appeal Status:
- Appeal Decision:
- An Coimisiún Pleanála File Ref.: PL-501898-LK-26
- Note: If an appeal has been lodged and information isn't showing then this means An Coimisiún Pleanála hasn't published the data for reuse by PlanningAlerts.ie. You will need to follow up directly on the ACP website. Use the reference number, above, if available.
No Commencement Found
Commencement Information:
- Notice Submitted:
- Start Date:
- BCMS Notice:
- View on BCMS Website
Copyright:
Planning Data is published by Department of Housing, Planning and Local Government and is licensed under a Creative Commons Attribution-NoDerivatives 4.0 International License.