Ballinleeny , (Coolrus & Kilmore townlands) , Bruree

Nov 15 2023

Application Received

Jan 17 2024

Decision

Jan 18 2024

Decision Due

Aug 13 2028

Expiry (if required)
  • Submitted: 15 / 11 / 2023
  • Application Type:
    EXTENSION OF DURATION
  • Application Status:
    APPLICATION FINALISED
  • Council Decision:
    CONDITIONAL (Granted)

Useful Links:

Development Description:

extension of permission for planning ref. 17/199: involves the provision of an Asphalt Batching Plant including a bunded bitumen storage area (roof), 6 no. hoppers for insertion of raw material, Reclaimed Asphalt Pavement (RAP) system, conveyor belt system and 5 no. bitumen/fuel storage tanks. The proposed development includes the installation of a new Class 1 (full retention) petrol interceptor & the provision of an emissions stack measuring 22.8m in height (12.8 m above original ground level). The proposal is located within an existing operational quarry on a site measuring 0.82 Hectares and will avail of existing site infrastructure. The site will be accessed off the adjacent local road (LP-1545) via the existing quarry road

Nearby Applications:

Appeals / Commencement

No Appeals Found

Decision Appealed:

  • Appeal Submitted:
  • Appeal Status:
  • Appeal Decision:
  • An Coimisiún Pleanála File Ref.:
  • Note: If an appeal has been lodged and information isn't showing then this means An Coimisiún Pleanála hasn't published the data for reuse by PlanningAlerts.ie. You will need to follow up directly on the ACP website. Use the reference number, above, if available.

No Commencement Found

Commencement Information:

Copyright: