850m |
03/05/2024 |
N/A |
Treacy's Oakwood Hotel , Airport Road Smithstown , Shannon Co Clare |
for development at an existing hotel consisting of: extension to Second Floor to accommodate additional 29 no. Bedrooms; extension to First Floor to accommodate additional ... login required. |
Details... |
2.7km |
29/04/2024 |
N/A |
Clonloghan , Newmarket-on-Fergus , Co Clare |
to construct dwelling house, garage, waste water treatment system, percolation area, entrance and all associated site works... login required. |
Details... |
670m |
26/04/2024 |
N/A |
Radharc Doire Smithstown , Shannon , Co. Clare. |
for development which will consist of (a) the construction of 13 no. two storey dwelling houses, (b) 15 no. two storey dwelling houses with optional additional attic bedroom accommodation. Total no. of 28 houses (c) all an... login required. |
Details... |
2.2km |
29/03/2024 |
N/A |
Ballycunneen , Newmarket-on-fergus , Ennis |
to Demolish existing substandard Garage and Permission for the Construction of a Domestic Garage and Store including ancillary site works... login required. |
Details... |
610m |
28/03/2024 |
N/A |
Sensing House , East Park Smithstown , Shannon |
for development consisting of proposed roof mounted Photovoltaic PV panels on existing roof and all associated site works ... login required. |
Details... |
860m |
27/03/2024 |
N/A |
Mincon International Limited , Smithstown Industrial Estate , Shannon Co. Clare |
to RETAIN the erecting of 1,764.23 m2 or 370.83 kWp of photovoltaic panels on the existing two roofs of our buildings located east and south of our factory land, with all associates site works ... login required. |
Details... |
1.7km |
22/02/2024 |
CONDITIONAL |
Clonmoney West , Bunratty , Co. Clare |
of existing single-story extension and wastewater treatment system. Planning permission is also being sought to demolish existing substandard conservatory, construct a single storey extension and a first-floor extension to include a balcony... login required. |
Details... |
1.4km |
21/02/2024 |
CONDITIONAL |
3 Inis Sioda , Shannon , Co Clare |
for development, the development will consist of an attic conversion to a living space to existing dwelling, a retention permission for a material change o... login required. |
Details... |
1km |
01/02/2024 |
N/A |
Smithstown Light Engineering , Bay H1A - Smithstown Industrial Estate Shannon , Co. Clare |
for development, the development will consist of proposed roof mounted Photovoltaic PV panels on an existing profile metal roof and all associated site works ... login required. |
Details... |
1.2km |
20/12/2023 |
N/A |
Clonmoney West , Shannon , Co. Clare |
to import inert fill to agricultural lands to improve the agricultural output of the land, provide for internal access road and all ancillary site works required to facilitate the proposed development ... login required. |
Details... |
1.9km |
20/12/2023 |
CONDITIONAL |
Illaunmanagh , Tullyvarraga , Shannon Co Clare |
to relocate the existing temporary 'Polytunnel' structure to a new location within the site for a period of 5 years along with associated site works. The works are to take place within the curtilage of a protected structure (RPS No 664)... login required. |
Details... |
1.3km |
19/12/2023 |
CONDITIONAL |
Shannon Town Centre , Tullyvarraga & Tullyglass , Shannon Co Clare |
for the amalgamation of units no. 40a (Dealz) and Units 37-40 (Formerly Iceland) to form one single retail unit in the Shannon Town Centre Shopping Centre. PERMISSION is being sought for the outlined as well as signage, internal demolition, and all associated site development works... login required. |
Details... |
940m |
11/12/2023 |
CONDITIONAL |
23 Tullyvarraga Crescent , Shannon , Co Clare |
of dwelling house and attached garage as constructed and all associated site works... login required. |
Details... |
1km |
29/11/2023 |
CONDITIONAL |
Drumline , Newmarket on Fergus , Co Clare |
of the following: a) RETAIN existing 1st floor living area and rear storage shed. b) PERMISSION to extend the front wall of the house to enlarge existing bedrooms ... login required. |
Details... |
300m |
27/11/2023 |
CONDITIONAL |
11 Ballycasey Close , Ballycaseymore , Shannon Co . Clare |
for the demolition of part of road boundary wall and modify existing kerb to construct new vehicular entrance to existing dwelling including ancillary site works... login required. |
Details... |
2.8km |
23/11/2023 |
CONDITIONAL |
Block N Bay 114-115 , Shannon Free Zone Shannon , Co. Clare |
for an extension to the existing metal fabrication workshop together with all ancillary works. A Natura Impact Statement (NIS) will be lodged as part of this application ... login required. |
Details... |
580m |
27/10/2023 |
CONDITIONAL |
27 Cluain Aoibheann , Shannon , Co. Clare |
for the construction of ground floor extension to the rear of the existing dwelling and all associated site works... login required. |
Details... |
3km |
19/10/2023 |
CONDITIONAL |
EI Electronics Campus , Shannon Industrial Estate , Shannon Co Clare |
for the construction of a new lift facility and all associated works ... login required. |
Details... |
400m |
11/10/2023 |
CONDITIONAL |
St Aidan's National School Smithstown , Shannon , Co. Clare |
the development will comprise of the construction of a single storey extension, comprising one mainstream classroom, one SET room, associated circulation space and... login required. |
Details... |
2.7km |
03/10/2023 |
N/A |
Clonmoney North , Bunratty , Co. Clare |
to construct an extension to rear and side of existing cottage and associated works to include renovation of cottage, installation of a wastewater treatment system and site works... login required. |
Details... |