Coolaboy Dromcollogher and , Mundellihy Ballinlongig Cloonmore Tulligmacthomas Cloonpasteen , Co. Limerick.

Jul 17 2025

Application Received

Sep 09 2025

Further Info. Requested

Nov 26 2025

Further Info. Received

Jul 16 2026

Decision

Jul 16 2026

Decision Due
  • Submitted: 17 / 07 / 2025
  • Application Type:
    PERMISSION
  • Application Status:
    DECISION MADE
  • Council Decision:
    CONDITIONAL (Granted)

Useful Links:

Development Description:

Uisce Éireann intends to apply for a 10-year planning permission to construct a new wastewater treatment plant (WwTP) at Coolaboy, Dromcollogher, Co. Limerick. The Proposed Development will comprise the construction of a new WwTP to provide treatment capacity for a population equivalent (PE) of 1,350 (10 years) and 1,550 (30 years). The wastewater will be treated and discharged via an outfall pipe into the River Deel at a location approximately 6.5 kilometres to the northwest of the WwTP. The outfall pipe will be located primarily in public roads in the townlands of Coolaboy, Mundellihy, Ballinlongig, Cloonmore and Tulligmacthomas. The existing WwTP will be decommissioned and demolished upon completion of the Proposed Development. The Proposed Development will comprise: i) Development of a new preliminary wastewater treatment plant including infrastructure such as bypass channels and screens; grit and fats, oils, greases (FOG) removal plant; storm water overflow tank; sludge drying reed beds; flash mixer chamber; return liquor pumping station facilities; caustic and ferric dosing storge tanks; flow to full treatment (FFT) pumping station; final settlement tank flow split chamber; 2 no. final clarifiers; sludge draw off chamber (return-activated sludge and waste-activated sludge pumping station); static mixer; wash water pumping station; tertiary disk filter; and final effluent pumping station. ii) Development of an ESB sub-station, control building, and fuel tank. iii) Provision of approx. 54m of new gravity sewer to direct flows to the new WwTP. This will replace an existing combined sewer overflow which will be decommissioned after the process switchover. iv) Provision of adequate site lighting, access gates, access stairs, walkways, car parking and electric charging facilities, and site boundary hedging and fencing. v) Provision of photovoltaic (PV) panels on the site of the existing WwTP following its decommissioning. vi) Provision of site drainage infrastructure including a hydrocarbon interceptor, construction of outfall pipe along public roads, and headwall in Tulligmacthomas. vii) Realignment and widening of existing site entrance, including provision of a new access road into the site and a bridge within the site. viii) All hard and soft landscaping throughout the site, and all associated and ancillary site works. The Proposed Development will be accompanied by a Natura Impact Statement (NIS)

Nearby Applications:

Appeals / Commencement

No Appeals Found

Decision Appealed:

  • Appeal Submitted:
  • Appeal Status:
  • Appeal Decision:
  • An Coimisiún Pleanála File Ref.:
  • Note: If an appeal has been lodged and information isn't showing then this means An Coimisiún Pleanála hasn't published the data for reuse by PlanningAlerts.ie. You will need to follow up directly on the ACP website. Use the reference number, above, if available.

No Commencement Found

Commencement Information: